Verified proseal setup around fuel cap. Removed wing from worktable to wing stand. Setup worktables for right wing spars. Collected truss and mounting hardware. (Front and rear spar on right wing were previously prepped with doublers and spar attach fittings installed. Also, I previously drilled and mounted the strut attach fittings and mounted them to the truss).