Title: Baffling
Continued work on baffling. Match drilled front left and right baffles to doublers and support tabs. Installed top front support bracket using existing case bolt. Still have to torque bolt when front halves are joined. Riveted front right flange for cabin heat scat tube. Enlarged oil cooler scat tube opening in right rear baffle to 4 inches per the plans.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.