Final install of throttle and mixture cables. Drilled mounts for second bolt. Checked travel of controls. Safetied cable to mount. Applied torque seal.
Added 1.5 inches to static line for G5 to give more room to remove G5 if necessary. Re-secured lower tray behind panel that houses control cables and G5 wiring and tubing.