Title: Elevator balance
Balanced elevator after painting. Insured trim tab, trim motor, arm and cover were installed. Used West Systems epoxy and 3lbs. lead shot. Used 3 pumps of resin and hardener per side. Poured 1.5 lbs in left side using funnel then added similar amount to right side until the elevator balanced.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.