Title: Right elevator complete
Right elevator completed. All rivets placed, everything was able to be squeezed except for the aforementioned 4, 426 rivets. Obviously ill have to roll the leading edge, install the control rods and do the fiberglass. Speaking off rolling the leading edge, I took a screen shot of a “tool” that was made and posted on VAF. I'm going to try it and see how it works.