Left leading edge was deburred, dimpled and placed in the cradle to be riveted. This went smoothly. Also installed the inspection panel and the small rib for the stall warner, although I am not installing the system due to I will be installing AOA, but it's there if i ever want it. Joint strip was also riveted into place.