Before heading off to work for 48 hours, I was able to finish up the day by placing and drilling the seatbelt anchors to the longerons.
I also riveted the 729 A/B together and to the 706 but I didn't get a picture. Oh! I also drilled the hole in the elevator bell crank that will accept the pushrod for the autopilot servo.