Vertical stabilizer was attached to the fuselage and to the HS. This whole tail attachment is definitely a sport where a 90 degree drill is required. The VS was aligned per the plans with respect to getting it square and canted a certain amount of degrees for p factor. The book says a 1/4” off centerline.
Once everything was set, I drilled the hole lot of rivet holes and bolt holes.