Title: 9-7: TE wedges and Final drilling skins
Cut the trailing edge wedges for each elevator and got them cleco'd in place. The elevator trailing edges were very rigid then, and I match drilled the holes in the trim tab close outs. Everything looks pretty good so far. Good alignment on trailing edge. Next, final drilled the skins on the left elevator. Started in the middle of the spars and worked my way putting a cleco in every hole. A lot of clecos. I'll need to finish off the left elevator entirely so I can harvest clecos for the right side. I had to skip the step for elevator horn installation because those parts are still back-ordered. I think I can go pretty far without them. Prepped the trim cable cover plates and installed the steel cable guides. I'll have to put the left elevator to the side and start on the right side.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.