Title: 9-7(R) to 9-9(R) Priming right elevator and start assembly
Got all of the right elevator parts cleaned, etched and masked - ready to prime. Took a break and then came back to priming everything in the afternoon. Priming went fine. I shot the outside of the counterbalance skins gray to match the left elevator. For some reason the gray ran a little bit. I cleaned it up but may need to touch it up later. Once I had everything cleaned up I saw that I missed the trim tab cable access plate. For some reason I thought I'd already done it with the left one. I'll get it later the next time I prime. Dimpled all the ribs and miscellaneous pieces. Saved the skins to do with Ben tomorrow. He loves that DRDT2. Assembled the counterbalance tip assembly and the installed the trim tab access nut plates. Didn't stop to take many photos. Pretty much the same as the left elevator.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.