Did the small amount of fabrication for the F-1010 bulkhead. Cut the angle stock on the band saw for the Horizontal Stabilizer support angle. I measure the 5/32 taper on each end but cut them the wrong direction. Luckily was able to recut them on the opposite leg of the angle and maintain the correct overall length.
Cleco'd the F-1010 pieces, clamped the support bracket and match drilled the #30 holes.
Got the F-1008 and F-1007 bulkheads deburred and drilled the rudder cable holes in F-1007. The rudder cable bracket that attached to F-1008 is back ordered.