Title: 22-8: Left flap finish up
Finally got the shop cleared enough to get back on the left flap. Got the trailing edge double flushes done this evening. Came out really straight. Looks good. 9/25: pressed the bushings into the brackets. Got the initial set with a vice clamp and a block of wood, then fine tuned it with a socket and clamp. Later realized this was probably a mistake as the bottom skins will be very tight fitting over them. Hopefully not too much trouble. My fault for going out of order.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.