Title: 18-8: Right tank finish up
Prepped and primed the right tank. Ready for install. Mix 150g of part A Ekopoxy and had quite a bit left over. Finish was not as smooth as left tank. Need to turn up the paint a bit to get it to flow. It was maybe a little warmer today. 11/8: dimpled tank and installed. Easy peasy. Temporarily held with clecos. 11/11: Neighbor helped me pull the left wing out of the cradle so I could access all the right tank screws. Installed all the AN bolts through the spar and torqued. Right wing tank is done.