Title: 28-4 thru 28-10: Forward fuse work
Just a little work here and there over the last week. Haven't really been logging well. I got the seat supports assembled and fabricated the control support angles. Got everything cleco'd and bolted together just to see how it fit. Confirmed everything was already final sized and had to drill a few of the #12s. This morning I fit the floor plates and then took everything apart. Installed the mid fuse spar and match drilled the holes for the tunnel ribs. I skipped 28-9 which would have temporarily joined the front fuse to the back since there was nothing left to match drill or final drill. Then proceeded with countersinking all of the seat supports and the bottom of the spar. Smoothed out the landing gear elliptical holes and then marked and cut the radius on the 1049K sidewall. Then deburred everything. Ready for priming. 4/9: was planning on flying today but overcast sky. Perfect for prepping and priming. Got all the fuse forward parts done.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.