Title: AC progress
Finally bit the bullet and spent an hour on my back underneath the plane countersinking all of the holes for the condenser scoop nutplates. Dabbed a little primer on each. These will be ready to rivet. Then moved back to the tunnel hose routing. I changed it up a bit and opted use adel clamps for the hoses rather than the little grommet support I had been thinking. This is much more secure. I still am adding some snap ring supports for the rudder cables and placing them directly over the adel clamp so even if the cables are completely slack there is no way they could snag on a clamp. This basically completes the hose routing in the baggage area. 2/3: big day today. Finally got all of the nutplates for the condenser scoop installed. It was a lot of work, and my wife helped me rivet everything. Didn't take any pictures of nutplates, but did get the condenser scoop temporarily installed. This is a big milestone as I can now get to work on finishing our the floors.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.