Title: Horizontal Stab and Elevator
Spent the last couple days fitting the ribs for the horizontal stab and elevator. I read over the directions for this part and changed the order on some of the steps. The directions call to Hysol the ribs onto the stab and elevator and then add stiffeners where required. I thought adding the stiffeners before actually installing the ribs would be easier and cleaner all around. There was also a 1/2" hole called out to be drilled into two of the ribs after they were installed. I marked where the hole would be while fitting those ribs and drilled it now. Hysol is in the process of drying on the stiffeners right now. I am thinking I will also do the lacquer on the ribs but leave the areas that get the Hysol when installing the ribs to the structure. I'll finish the lacquer over all the ribs once they are installed but that should be a quick job. Also going to do the fitting of the bearings on the elevator before I install the ribs. That way I won't run the chance of breaking a rib if I get careless.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.