Title: Horizontal stab and Elevator
Busy week between getting the house ready for Winter and working on the plane. I got the bushings for the elevator all fitted into the bearings on the horizontal stab. I used an older file (read not real aggressive in removing metal) and took the bushings down to a diameter of 0.312. Then used the suggested sand paper method to fine fit them. This took almost a day to complete. Started on coating the end caps with Hysol and giving them the final shape. My elevator was actually about 1/8 inch wider than the stab on one end so I made that end cap just a bit thicker to make them both the same width. If you measure the progress on the plane by how much Hysol you use - I finished my first cans!! While I was working the end caps I also varnished the ribs except for the ends where I would be applying the Hysol to glue them in. Hysol and varnish I understand don't make the best bond. Transferred the rib placement dimensions from the instructions to the assembly and then adjusted the ribs a bit to take advantage of the metal structure where it was available. I made sure the ribs were fitted perpendicular to the tubes with the hinges. Once I had them all dry fit I used my trusty aluminum angle pieces and CA glue to insure that the ribs were lined up on the stab and elevator and holding them in position to get the Hysol. Also by checking the distance between the two aluminum angles, I was able to be sure that the ribs were parallel with each other (checked my dry fitting job). Finally got the ribs Hysol'd on the upper side of the assembly. Will do the bottom side tomorrow.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.