Title: ELT Finish up and Magnetometer Start Up
Got the 90 degree RGB connector via Amazon and was able to easily for once finish up the install connections. Moved on to the magnetometer installation. Easy but a bit tricky in terms of fitting it on a wing inspection plate and various interference points. Spent a lot of time measuring multiple times. Did have to drill out/remove one of the nut plates to get a cardinal alignment on right wing plate C.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.