Title: Fuel lines finished and leak tested
A lot of time was spent fitting the lines through the forward floorboards and getting everything bent just right so as not to have any low spots. Rubber grommets were used to secure the lines going through door formers. Adel clamps were used to secure the lines. Leak test was good with a measured line on the ballon for 4-5 hours with no shrinkage


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.