I have been going through the plans finding parts that can be fabricated now even though the substructure may not be built. For example the elevator bellcrank pictured below was done today. I also worked on the elevator stops, the elevator pushtubes (priming) and fitting the aft deck. The pushtubes still need to be cut to size and riveted, that will be next.