Title: Various fusalage tasks
I got some more back ordered parts. The shipping company actually dropped off a pallet of return items, needles to say I was surprised. I quick call and they realized their mistake and brought me what they were suppose to. I have 99.9% of the fuselage kit at this point. I also received a new rudder cable so I got that installed pretty quickly. To get the rudder pedals working smoothly in the front I had to cut/grind away some interfering material on the rudder limiting brackets. This wasnt a surprise and is covered in the manual. I also installed the insulating foam and forward inboard skins. I fabricated an ELT mount for the aft fuselage out of the wing jigs. Lastly, the non-parachute cable tray that I received does not fit. I compared it to the parachute cable tray and they are very different sizes. I reached out to technical support and they let me know the tray was mis-manufactured and they are sending a replacement. Lastly I started cutting some foam blocks (the pink blocks) to seal off an air channel to distribute fresh air to the back seats.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.