Title: Wing kit delivery and inventory
The wing kit was delivered today in two boxes by ABF freight without any surprises. There were a number of items listed as back-order on the inventory sheet, so those will be shipped to me later at some point (mostly things like pushrods and some bags that had nutplates). I had to go out and buy a couple more plastic shelving units to help storing these things as I take them out of the crates. After counting things, I've been keeping the "bags" of mixed items together since they seem to be grouped by tasks. However, the "subkits" of larger punched aluminum pieces are grouped together just for the purposes of shipping, so there's no real benefit to keeping them together. The bags of rivets (only the ones that have more than a couple dozen rivets in them) have been put into 9 oz plastic "spice jars" that I've labelled with the rivet type. The nutplates have also been put into a plastic drawer system and labelled too. I've completed the inventory of the small parts and subkit 1, so I'm more than half-way through the entire inventory. What remains for inventory and organization is mostly just the spar, angle pieces, and larger cut aluminum pieces. I found one parts bag that was missing all of one type of washer, so I'll contact Van's Aircraft about that once I'm done with inventory.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.