Created images with labels for new circuit breakers and groupings of switches. Created images for the new ignition switch and throttle/mixture bracket. Created new label for the stick switches. Placed new images on the panel to create a new layout. Sent pictures and notes about the changes to see if I get more feedback.
Sent request for updated quote to the panel designer and fabricator.
Started looking at electrical loads to see if I want keep 1 or 2 of the TCW 6AH battery backups.