Researched options, completed brake bleeder design and ordered parts.
Installed right fuel line from Andair valve through the F-783B R bracket. Determined position for reinforcement bracket and match drilled. Opened up holes in F-783B R bracket as needed. Deburred edges of holes in the R and L brackets and reinforcement plates. Deburred edges of both reinforcement plates. All pictures for this entry are for the right side only.