Title: Baggage Floor
Right side Baggage Floor (75F5-6) was replaced with shop fabricated part. This was due to the numerous rivet holes which had been drilled. New part was fitted and accept for the rivet holes and planned inspection plates the part is complete. Much improved over the original part. Materials (6061T6 t= 0.025") were from on hand stock.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.