Title: ERFT; 16-3; 12-14 steps 1-6 Left Tank
Installed the baffling using rivets and proseal called out in the instructions. After curing for 2 days, I went in and installed the z brackets. Then I countersunk and riveted the 10 #40 holes aligning the skin to the baffling. 1 tank done!


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.