5 minute job turned into an hour but the final two brackets are installed.
Also looked at the wing lights next to the wing tip and the light is the correct width for the diameter of the tubing. I'll have to grab my rivet nut stash from home and see how it might look in some sacrificial tubing before attempting to drill the wing tip tubing.