Builder Name:Mike Smith   -  
Project:   Vans - RV-9A   -   VIEW REPORTS
Total Hours:70.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Aug 02, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=msmith

Home or Last Project Picture

Feb 16, 2020     Beginning the VS - (2.5 hours)       Category: Empennage
Clecoed the doubler to rear spar. Deburred the ribs. Clecoed rear spar, doubler, front spar and ribs.


 
Feb 16, 2020     Finishing the HS - (8 hours)       Category: Empennage
Put the finishing touches on the HS. It's been a long process starting and stopping.


 
Feb 10, 2020     Even more horizontal stabilizer - (20 hours)       Category: Empennage
I haven't posted in a while. Life has gotten in the way and I haven't done much. I'm almost finished with the HS. All that is lacking is riveting the rear spar. I hope to get that done this week. Then on to the vertical.


 
Oct 05, 2019     More Horizontal - (6 hours) Category: Empennage
Match drilled the right side. Took apart and deburred. Assembled the left side.
 
Oct 01, 2019     Horizontal - (2 hours)       Category: Empennage
Put the right side horizontal together. Match drilling is next.


 
Sep 22, 2019     Prep and prime - (8 hours)       Category: Empennage
I am terrible at keeping this updated. I have worked many days both working on the shop and airplane. Since my last update I have attended a building fundamentals class put on by synergy air in Newnan Georgia. Learned some and met some good folks. Came home and practiced with my son and building buddy, he is camera shy for now.


 
Aug 28, 2019     Airplane parts - (1.0 hour)       Category: Empennage
Spent the evening checking parts. Dropping a rivet in holes to see if all were already match drilled. Found about 8 that had been missed. Clecoed parts together to check everything. Looks ok. Time to take back apart, debur, prime, make sure the ribs are straight and start putting it back together for riveting.


 
Aug 27, 2019     Sorting it out - (1.0 hour)       Category: Empennage
Starting to sort things out and get ready to build. Because I bought a second hand kit that had been started, I am having to check the previous work.


 
Aug 07, 2019     For sale!       Category: Tools
Cleaveland C-Frame, new never used.


 
Aug 06, 2019     A small beginning - (2 hours)       Category: Workshop
Started on the toolbox practice kit. Found out I need drill bits.


 