EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Bearhawk
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (10)
Research
- (1)
Workshop
Empennage
Fuselage
Firewall
Tail Feathers
Wings
- (9)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Craig Buttery
-
Project:
Bearhawk
-
VIEW REPORTS
Total Hours:
39
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 18, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Bearhawk
Home or Last Project Picture
Sep 06, 2020
Right main spar
- (4 hours)
Category: Wings
No picture today not much visual progress. Disassembled the spar and deburred about 1750 holes. I don't remember so many holes on the rear spars. Next is to strip, alodine and prime these parts
May 13, 2020
Right main spar
- (6 hours)
Category: Wings
Finished all match drilling and deburred small parts. Cut lightening holes as called out in drawings.
D59B3100-E0D5-404B-B9B3-4458932E89F2.jpeg
DD9FFBA2-56DF-473F-88EF-64AB1563123C.jpeg
Mar 29, 2020
Rear spars
- (4 hours)
Category: Wings
Finished fitting spar caps. Added wing attach fittings and wing splice.
3EB54CCA-FDD2-4DE7-B536-F09CAFA510EB.jpeg
8C04C5F2-A4BC-4795-9DCF-E77D2B16AC7B.jpeg
97898671-E68E-4001-8999-1677F0006A41.jpeg
Mar 28, 2020
Rear spar
- (3 hours)
Category: Wings
Locating spar caps on the spar
1A354C85-EE01-47A3-B178-97A539C7192F.jpeg
668E7248-F64B-44AF-8769-4721E76D9A79.jpeg
Mar 26, 2020
Main spars
- (5 hours)
Category: Wings
Finished drilling spar cap strips for the left wing. Began locating them on the spar blank
Mar 25, 2020
Main spars
- (4 hours)
Category: Wings
Continue work on spar cap strips
Left wing spar caps
Main spar drawing
Mar 24, 2020
Main spars
- (4 hours)
Category: Wings
Layout and drilling spar caps
Feb 22, 2017
Rear spars
- (5 hours)
Category: Wings
Manufactured 30 vertical spar cap spacers
Feb 15, 2017
Rear spars
- (3 hours)
Category: Wings
First day of building cut out end fittings for one wing
Oct 18, 2016
Parts start arriving
- (1 hour)
Category: Research
Parts start arriving from BearHawk they are laced out and inventoried
34F004B9-59C9-4CA2-83A6-330350793E2A.jpeg
6760297E-8A13-45C9-8FF5-B07BB020DBA6.jpeg
998DD130-D9FE-44E4-93B4-34EB47C2A0DE.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.