EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
WoodysSportsman
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (389)
Admin
- (1)
Rudder
Elevator
- (1)
Wings
- (55)
Fuselage
- (87)
-
Cut and fit firewall
-
Finish rework of the...
-
Finish installing...
-
Continue shear web...
-
Trim new shear webs,...
-
Remove shear web glass
-
COMPLETE CH 8,...
-
Trim vert stab...
-
Layup vertical...
-
Cut carbon fiber for...
-
Completed...
-
Rivet the elevator...
-
Complete riveting...
-
Continue riveting...
-
Start riveting the...
-
Continue checking...
-
Check alignment on...
-
Install vertical...
-
Touch up parts, fit...
-
Complete drilling...
-
Continue wing brace...
-
Completed shear webs
-
Start vertical stab...
-
Complete rudder stop...
-
Rudder Stop Plate...
-
Rudder Stop Plate...
-
Forward shearweb...
-
Forward shearweb...
-
Trim forward shear...
-
Side layups forward...
-
Start forward...
-
Aft shear webs...
-
Aft shear webs
-
Cut and trim...
-
Layup shearweb...
-
Final trim of the...
-
Final Fitting and...
-
Debur vert stab spar...
-
Completed drilling...
-
Mark port side vert...
-
Mark pilot side...
-
Countersink holes in...
-
Install new...
-
Rudder installation
-
Rudder installation
-
Cut hole for SB58...
-
Test fitting to try...
-
Measuring the...
-
Initial fitting of HS
-
Start grinding down...
-
Install the...
-
Trim the trailing...
-
Sand and fit the...
-
Press Upper rudder...
-
Alodine the upper...
-
Complete drilling...
-
Install upper rudder...
-
Start prepping parts...
-
Set waterline and...
-
Countersink cleanup
-
Cleanup of some...
-
Completed...
-
Complete...
-
Start setting up...
-
Start installing...
-
Paint Attach Tabs...
-
Complete and install...
-
Rework pilot attach...
-
Drill and...
-
Countersink attach...
-
Drill attach tabs...
-
Complete bottom pads...
-
Upper center pad for...
-
Upper aft attach tabs
-
Trim forward attach...
-
Install forward...
-
Mask forward attach...
-
Complete painting of...
-
Prime the attach tabs
-
Debur attach tabs
-
Trim forward attach...
-
Complete forward...
-
Complete aft attach...
-
Complete fuselage...
-
Complete the side...
-
Complete installing...
-
Start installing...
Systems
- (105)
Tools
Workshop
Inspection
Finish
- (140)
Builder Name:
John Wood
-
Project:
Glasair - Sportsman 2+2
Total Hours:
873.4
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 04, 2017 - No Finish Date
Engine:
Lycoming IO390 C3B6
Propeller:
Hartzell 80” Trailblazer
Panel:
Garmin G3X dual display/GTN650Xi/G5/GNC215
Friendly URL:
https://eaabuilderslog.org?s=WoodysSportsman
Home or Last Project Picture
Mar 23, 2024
Installed GMA245R and GTX45R on right porkchop
- (3 hours)
Category: Finish
Assembled brackets for the GTX 45R tray and installed both the Audio panel and transponder onto the right pork chop
IMG_2250.jpeg
IMG_2251.jpeg
IMG_2252.jpeg
IMG_2253.jpeg
IMG_2254.jpeg
Mar 17, 2024
Installed GEA24 and GAD29 on left porkchop
- (1.5 hours)
Category: Finish
IMG_2204.jpeg
IMG_2205.jpeg
Mar 15, 2024
More panel assembly
- (1 hour)
Category: Finish
Added support brackets
IMG_2168.jpeg
IMG_2169.jpeg
Mar 14, 2024
Install updated panel
- (2 hours)
Category: Finish
Installed the updated panel, needed to spin the panel to R5 since there were interference issues
IMG_2166.jpeg
Mar 01, 2024
Assemble new radio stack backets
- (3 hours)
Category: Finish
IMG_2029.jpeg
IMG_2030.jpeg
IMG_2031.jpeg
Nov 22, 2023
Assemble front gear assy
- (1 hour)
Category: Systems
Press pins into fork
Install wear pad onto fork
Assemble fork onto leg
IMG_0553.jpeg
IMG_0554.jpeg
Nov 21, 2023
Installed Stick Grips
- (2 hours)
Category: Finish
Installed the stick grips on the control sticks.
This required removing material from the inside at the base of the grips due to the bend in the tube.
IMG_1675.jpeg
IMG_1676.jpeg
Nov 21, 2023
Installed bushing in gear fork
- (0.3 hour)
Category: Systems
IMG_1672.jpeg
IMG_1674.jpeg
Nov 19, 2023
Complete GPS tray install / Final Panel Install
- (4 hours)
Category: Finish
Completed fabricating and installing GPS support braces
Final installation of carbon panel
Notes need to make support for one screw that will interfere with alt switch
IMG_1663.jpeg
IMG_1664.jpeg
IMG_1666.jpeg
IMG_1667.jpeg
Nov 17, 2023
Start fabricating GPS braces
- (1.5 hours)
Category: Finish
Started fabricating and installing forward supports for the GPS tray
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.