Project: Minimax   -  
            All Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dennis Tyson   -  
Project:   1100R   -   VIEW REPORTS
Total Hours:734.5
Total Flight Time:
Total Expense:$13481.32
Start/Last Date:Feb 10, 2020 - No Finish Date
Engine:Hummel 1/2 VW
Propeller:Performance Propeller
 
Friendly URL: https://eaabuilderslog.org?s=Minimax

Home or Last Project Picture

Jun 12, 2023     Installed Brakes - (10 hours)       Category: Controls
Installed Brakes and made cover for fuel tank from Lexan


 
Jun 06, 2023     Painted top of Left Wing - (8 hours)       Category: Paint / Decals
Painted top of wing and added roundel


 
May 31, 2023     Painted Bottom of Left Wing - (6 hours)       Category: Paint / Decals
Painted wing bottom and added bottom roundel


 
May 29, 2023     Sealing Left Wing for Paint - (4 hours)       Category: Fabric Cover


 
May 26, 2023     Started Painting Roundels - (5 hours)       Category: Paint / Decals


 
May 23, 2023     Installed Rudder Cables and Steering - (6 hours)       Category: Controls


 
May 19, 2023     Installed Throttle Cable - (6 hours)       Category: Controls
Fabricated supports and installed housing and cable


 
May 12, 2023     Covered Left Aileron - (6 hours)       Category: Fabric Cover


 
May 08, 2023     Finishing Tapes on Left Wing - (6 hours)       Category: Fabric Cover


 
Jan 28, 2023     Rib Stitched Left Wing - (8 hours)       Category: Fabric Cover
Rib Stitched using the Superflite method with the help of my son Parker


 
Jan 15, 2023     Finished Fabric on Left Wing - (8 hours)       Category: Fabric Cover
Finished up the fabric and prepared the wing for rib stitching


 
 
Nov 28, 2022     Covering Bottom of Left Wing - (6 hours)       Category: Fabric Cover
Started the wing covering using Stewart Systems and Light Weight Fabric


 
Aug 31, 2022     Finished up the tank bay change - (4 hours)       Category: Wings


 
Aug 24, 2022     Wiring to Instrument Panel and Engine - (6 hours)       Category: Instrument Panel
Installed wiring to senders and ignition


 
Jul 14, 2022     Wind Screen install - (4 hours)       Category: Fuselage
Started the installation of the wind screen


 
May 09, 2022     Tested Engine to mounts - (3 hours)       Category: Engine


 
Apr 25, 2022     Painted Engine Bay - (8 hours)       Category: Paint / Decals
Painted the engine bay with a good marine paint and started putting urethane on the left wing


 
Apr 11, 2022     Connected Instrument Panel and Radio to power - (5 hours)       Category: Avionics


 
Apr 06, 2022     Installed radio and jacks - (5 hours)       Category: Avionics


 
Mar 30, 2022     Fuel tank supports - (3 hours)       Category: Wings
Installed members in fuel tank bays to prevent tank from moving fore and aft


 
Mar 26, 2022     Drilling holes for access to engine mount bolts - (2 hours)       Category: Fuselage


 
Mar 21, 2022     Correction to fuel tank opening - (5 hours)       Category: Wings
The plans are designed around a 5 gallon tank which is what I built to. The available tanks at the time were 6.5 gallon. This required the rear cross member to be relocated in the tank bay.


 
Mar 13, 2022     Built Battery Tray - (4 hours)       Category: Electrical


 
Mar 12, 2022     Intake Clearance - (4 hours)       Category: Fuselage
Finished up the change in hole location


 
Mar 10, 2022     Intake Clearance - (6 hours)       Category: Fuselage
Had to correct fuselage side for engine intake clearance


 
Mar 09, 2022     Aircraft Spruce Category: Expense
Clamps, Hinge Pins
 
Mar 08, 2022     Painting Tail Feathers - (6 hours)       Category: Paint / Decals
Painted tail pieces and worked on the radio mount


 
Mar 08, 2022     Aircraft Spruce Category: Expense
Expandable wrap
 
Mar 06, 2022     Aircraft Spruce Category: Expense
Engine Mount Bolts, Lexan .060 Windscreen Material
 
Mar 02, 2022     Covering Elevator and preparing to mount engine - (8 hours)       Category: Tail Feathers
Covered Elevator, machined standoff's for engine bed, mounted instrument panel, ready the comm antenna for install in the right wing


 
Feb 26, 2022     Aircraft Spruce Category: Expense
Plastic Cleaner, Hose Clamps
 
Feb 25, 2022     Aircraft Spruce Category: Expense
Round Bar for Engine Mounts
 
Feb 24, 2022     Installed Shoulder Harness, Seat Belt, and Shoulder Harness - (6 hours)       Category: Fuselage
Covered Rudder and Installed Seat Belt and Head Rest


 
Feb 21, 2022     Team Minimax Category: Expense
Balance of Engine picked up from Hummel Aircraft Engines
 
Feb 21, 2022     Team Minimax Category: Expense
Fuel Tanks
 
Feb 19, 2022     Aircraft Spruce Category: Expense
Fabric, VHF Antenna
 
Feb 19, 2022     Aircraft Spruce Category: Expense
Fabric
 
Feb 19, 2022     Aircraft Spruce Category: Expense
Green Primer
 
Feb 01, 2022     Aircraft Spruce Category: Expense
Radio Jacks, AN Hardware
 
Jan 31, 2022     Covering Stab - (4 hours)       Category: Fabric Cover


 
Jan 28, 2022     Covering Landing Gear and Headrest - (4 hours)       Category: Fabric Cover


 
Jan 26, 2022     Painting Fuselage - (8 hours)       Category: Paint / Decals
Using exterior Acrylic Enamel paint rolled on


 
Jan 24, 2022     Aircraft Spruce Category: Expense
Polyfiber Finishing Tape
 
Jan 22, 2022     More Fuselage Covering - (8 hours)       Category: Fabric Cover


 
Jan 19, 2022     Aircraft Spruce Category: Expense
Drain Grommets, Log Books
 
Jan 18, 2022     Aircraft Spruce Category: Expense
Terminals, Stewart Systems Glue
 
Jan 14, 2022     More Fuselage Covering - (6 hours)       Category: Fabric Cover


 
Jan 07, 2022     Fuselage Bottom - (4 hours)       Category: Fabric Cover


 
Jan 07, 2022     Aircraft Spruce Category: Expense
MGL Instruments, Wire, Breakers, Terminals
 
Dec 20, 2021     Elevator Cable , Control Stick Install - (6 hours)       Category: Controls


 
Dec 01, 2021     Polyurethane the fuselage - (4 hours)       Category: Fuselage


 
Dec 01, 2021     Aircraft Spruce Category: Expense
Iron, Fabric, Stewart Systems Glue
 
Nov 28, 2021     Landing Gear Stop Blocks - (2 hours)       Category: Landing Gear


 
Sep 26, 2021     Fairlead Install - (2 hours)       Category: Controls


 
Sep 12, 2021     Windscreen Work - (2 hours)       Category: Fuselage


 
Aug 27, 2021     Building Headrest - (6 hours)       Category: Fuselage
Assembled plywood headrest


 
Aug 26, 2021     Aircraft Spruce Category: Controls
Green Primer
 
Aug 21, 2021     Windscreen - (3 hours)       Category: Fuselage
Starting assembly of the lexan windscreen


 
Aug 17, 2021     Windscreen Roll Over Cage - (3 hours)       Category: Fuselage


 
Aug 17, 2021     Windscreen Roll Cage - (3 hours) Category: Fuselage
 
Aug 15, 2021     Wing Strut Tubes - (6 hours)       Category: Wings
Putting the struts on is a time consuming process due to the many things that have to be checked and re-checked. The tubes mount to the landing gear and the wing spars. They main spar sets the wings dihedral angle and the rear spar ensures the incidence from root to tip stay the same. I have 3* dihedral and +2* Incidence. My son Parker has been a huge help with this process.


 
Aug 06, 2021     Aircraft Spruce Category: Expense
Lexan, AN Bolts, and 1/4" 4130 rod for wing mounting pins
 
Aug 06, 2021     Aircraft Spruce Category: Expense
Metal Cleaner and Rivet Backing Washers
 
Aug 05, 2021     Made wing strut mounting tubes and brackets - (3 hours)       Category: Wings


 
Aug 02, 2021     Mounted right wing to the fuselage - (7 hours)       Category: Wings
Made the carry through bracket and got the right wing mounted and ready for strut tubes. The wing is set for 3* dihedral and 2* incidence.


 
Aug 01, 2021     Mounted Stab - (3 hours)       Category: Empennage
Mounted the stab to the fuselage


 
Jul 30, 2021     Stab mounting brackets and fin support tubes - (4 hours)       Category: Empennage
Built the brackets for mounting the stab and cut the tubes for the vertical stab support


 
Jul 23, 2021     Aircraft Spruce Category: Expense
Control Cable, Nicopress sleeves, Thimbles, Go No-Go gauge, Safety Wire
 
Jul 23, 2021     Turnbuckles and AN3-25A Bolts Category: Expense
 
Jul 16, 2021     Hinged the Elevator and and Stab - (4 hours)       Category: Empennage
Built the brackets for the vertical stab support and hinged the elevator and stab


 
Jul 06, 2021     Epoxied elevator components together - (2 hours)       Category: Empennage
Epoxied everything together for the elevator and tested the design for the windscreen


 
Jul 04, 2021     Elevator - (4 hours)       Category: Empennage
Laid out spars and cut ribs for elevator


 
Jun 30, 2021     Riveted Roll Over Cage - (3 hours)       Category: Fuselage
Installed the gussets on the roll cage with 1/8" cherry rivets
Epoxied the ribs into the horizontal stab


 
Jun 28, 2021     Horizontal Stab Ribs - (4 hours)       Category: Empennage
Cut all of the ribs for the stab and prepped them for epoxy


 
Jun 26, 2021     Horizontal Stab - (3 hours)       Category: Empennage
Laminated the leading edges and started the stab outline


 
Jun 26, 2021     Securing Cable and Static Ports - (2 hours)       Category: Controls
Built some mounts to secure elevator cable and built the blocks for static ports.


 
Jun 16, 2021     Finished the Gascolator mount - (3 hours)       Category: Fuel System


 
Jun 14, 2021     Mount for Elevator control cable - (4 hours)       Category: Controls
The mount at the rear fuselage for the cable is a T6 angle. This angle doubles as the shoulder harness mount.


 
Jun 12, 2021     Built mount for the Gascolator - (2 hours)       Category: Fuel System
Used some .032 T6 sheet to build a mount for the gascolator.
Spent a lot of time figuring out the location to keep it clear and out of the way.


 
Jun 11, 2021     Drain, Hinges, Lexan Category: Expense
Safe-Air Drain, Aluminum hinges, and lexan for windscreen
 
Jun 10, 2021     Rudder Pedals - (3 hours)       Category: Controls
Attached rudder pedal hinges to the floor board


 
Jun 07, 2021     Hinging the Rudder - (5 hours)       Category: Empennage
Prepared the hinges and slotted the stab and rudder to receive them. Also worked on the rudder pedal hinges.


 
Jun 04, 2021     Fuel Elbow and Machine Screws Category: Expense
 
Jun 04, 2021     Cab-o-sil Category: Expense
 
May 31, 2021     Elevator and Hinges - (6 hours)       Category: Empennage
Assembled the rudder and made the hinges for the rudder and elevator. Also slotted for the elevator trim cable


 
May 27, 2021     Misc Category: Expense
Facet Pump
All T6 Tubing for landing gear and wind screen
 
May 26, 2021     Vertical Stab - (4 hours)       Category: Empennage
Got the stab together and tested out the trim cover


 
May 24, 2021     Cover for Elevator Trim - (2 hours)       Category: Controls
Made the trim cover from some .032 aluminum sheet


 
May 22, 2021     Throttle Quadrant and Elevator Trim - (5 hours)       Category: Controls
Made the mount for the throttle quadrant and for the elevator trim. Then I got the mounts attached to the fuselage.


 
May 16, 2021     Instrument Panel completion - (2 hours)       Category: Instrument Panel
Put the back panel on the panel assembly and tested on the fuselage. Also laminated the 1/4 x 1-1/4 vertical stab leading edge together.
The last thing I did was put the Push to Talk switch on the stick


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.