Project:   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Kim Anderson   -  
Project:   Zenair - CH 750 Cruzer   -   VIEW REPORTS
Total Hours:522.2
Total Flight Time:
Total Expense:$3722.00
Start/Last Date:Mar 10, 2020 - No Finish Date
Engine:Corvair
Propeller:Warp Drive
 
Friendly URL: https://eaabuilderslog.org?s=

Home or Last Project Picture

Apr 09, 2024     Completed service bulletin - (5 hours)       Category: Tail Feathers
Completed service advisory of horizontal stabilizer. Ordered all new sheet .025 aluminum from zenith. Added additional rivets. Next I will mount it and do the hinges as required.


 
Mar 12, 2024     Upgrade Service bulletin       Category: Tail Feathers
Finally redoing horizontal stabilizer service bulletin. Drilling out old rivets and removing skin. Ordered New skin from Zenith and it comes pre drilled and thicker skin. .025. Built another table from the crate they shipped everything in.


 
Apr 12, 2023     aircraft assembly - (50 hours) Category: Research
Going over and studying plans and web sites for the Zenith 750 over several years
 
Jun 28, 2022     Heads       Category: Engine
Still waiting on my heads as well as everyone else. Pictures are when I put on 5th bearing.


 
Jun 28, 2022     Moving to hangar - (6 hours)       Category: Moving Day
Moved my fuselage to new hangar at KFCI. Rented a U-Haul car carrier for my fueslage. It fit snug between the wheel wells. Then I rented a 6x12 with ramp and the wings rolled right on. Next was my 12ft table. Moved everything without any problems.oh boy


 
Jan 04, 2022     Block - (5.5 hours)       Category: Engine
Continued working on block. Closed the case. Cam and Crankshaft installed. Working on installing 5th bearing on front.


 
Sep 04, 2021     Prepping Tail area - (3.5 hours)       Category: Tail Feathers
Started prepping Tail area for the horizontal stabilizer and rudder.


 
Jun 09, 2021     Panel - (12.3 hours)       Category: Instrument Panel
Worked on getting panel finished. Using Fallkin Avionics with Ipad.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.