EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (46)
Research
- (1)
Workshop
- (2)
Empennage
Fuselage
- (7)
Firewall
- (2)
Tail Feathers
- (5)
Wings
- (3)
Controls
- (3)
Avionics
- (5)
Lighting
- (1)
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (3)
Propeller
Fuel System
Interior Finish
- (2)
Paint / Decals
Inspection
Tools
- (1)
Pick up
- (1)
Moving Day
- (1)
Builder Name:
Kim Anderson
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
522.2
Total Flight Time:
Total Expense:
$3722.00
Start/Last Date:
Mar 10, 2020 - No Finish Date
Engine:
Corvair
Propeller:
Warp Drive
Friendly URL:
https://eaabuilderslog.org?s=
Home or Last Project Picture
Apr 09, 2024
Completed service bulletin
- (5 hours)
Category: Tail Feathers
Completed service advisory of horizontal stabilizer. Ordered all new sheet .025 aluminum from zenith. Added additional rivets. Next I will mount it and do the hinges as required.
PXL_20240409_173622071.jpg
PXL_20240312_183233821.jpg
PXL_20240312_201446522.jpg
PXL_20240316_204012205.jpg
Mar 12, 2024
Upgrade Service bulletin
Category: Tail Feathers
Finally redoing horizontal stabilizer service bulletin. Drilling out old rivets and removing skin. Ordered New skin from Zenith and it comes pre drilled and thicker skin. .025. Built another table from the crate they shipped everything in.
PXL_20240312_170644577.MP.jpg
PXL_20240312_170650853.jpg
PXL_20240312_170705634.jpg
Apr 12, 2023
aircraft assembly
- (50 hours)
Category: Research
Going over and studying plans and web sites for the Zenith 750 over several years
Jun 28, 2022
Heads
Category: Engine
Still waiting on my heads as well as everyone else. Pictures are when I put on 5th bearing.
PXL_20220107_213031443.jpg
PXL_20220107_213154488.jpg
Jun 28, 2022
Moving to hangar
- (6 hours)
Category: Moving Day
Moved my fuselage to new hangar at KFCI. Rented a U-Haul car carrier for my fueslage. It fit snug between the wheel wells. Then I rented a 6x12 with ramp and the wings rolled right on. Next was my 12ft table. Moved everything without any problems.oh boy
PXL_20220623_190215733.MP.jpg
PXL_20220623_181827185.jpg
PXL_20220621_215332499.jpg
PXL_20220623_181914416.jpg
Jan 04, 2022
Block
- (5.5 hours)
Category: Engine
Continued working on block. Closed the case. Cam and Crankshaft installed. Working on installing 5th bearing on front.
16413374695872236810834269782979.jpg
PXL_20211129_004744039.jpg
PXL_20211129_165558131.jpg
PXL_20211130_165243133.jpg
Sep 15, 2021
Horizontal and vertical fin
- (8.5 hours)
Category: Tail Feathers
Put my vertical tail fin together. horizontal section has been done at the beginning. Mounted and test fitted. Will wait till I get a hanger to mount them.
PXL_20210912_235913389.jpg
PXL_20210912_235921863.jpg
PXL_20210904_224456709.jpg
PXL_20210904_224439723.jpg
PXL_20210911_142124446.jpg
PXL_20210907_152138866.jpg
PXL_20210910_211946360.jpg
PXL_20210910_211956172.jpg
PXL_20210910_235003582.jpg
PXL_20210912_170032669.jpg
PXL_20210913_004815509.MP.jpg
Sep 04, 2021
Prepping Tail area
- (3.5 hours)
Category: Tail Feathers
Started prepping Tail area for the horizontal stabilizer and rudder.
IMG_20210903_204821_01.jpg
PXL_20210901_234237653.jpg
Jul 10, 2021
ELT
- (2.0 hours)
Category: Avionics
Made ELT bracket and installed. Always a tight area for zeniths
PXL_20210710_215458991.jpg
PXL_20210709_214320708.jpg
PXL_20210709_214329459.jpg
PXL_20210710_004529847.jpg
PXL_20210710_004601593.jpg
PXL_20210710_215440522.jpg
PXL_20210710_215451676.jpg
Jun 09, 2021
Panel
- (12.3 hours)
Category: Instrument Panel
Worked on getting panel finished. Using Fallkin Avionics with Ipad.
PXL_20210707_234654786.jpg
PXL_20210709_153303276.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.