Project: rearly   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Roy Early   -  
Project:   Swearingen - SX-300   -   VIEW REPORTS
Total Hours:1468
Total Flight Time:
Start/Last Date:Jul 10, 2014 - No Finish Date
Engine:Lycoming
Propeller:Hartzell
 
Friendly URL: https://eaabuilderslog.org?s=rearly

Home or Last Project Picture

May 08, 2024     External power plug installation - (10 hours)       Category: Electric
Started making doublers and rough cut the door for the external power plug


 
May 03, 2024     Accumulator Mounted       Category: Hydraulics
Mounted accumulator in left wheel well


 
May 03, 2024     Pump mount - (10 hours)       Category: Hydraulics
Started the pump mount


 
Apr 22, 2024     Baggage plumbing - (10 hours)       Category: Hydraulics


 
Apr 14, 2024     Almost there - (10 hours)       Category: Hydraulics
All the lines are in place. The ends of the suction, pressure and return lines need in line unions to connect to the lines to the pump. The only missing line is to the accumulator.


 
Apr 04, 2024     Gear up/down lines - (4 hours)       Category: Hydraulics


 
Apr 01, 2024     Left side hydraulics - (8 hours)       Category: Hydraulics
Gear up/down, pressure and door close lines


 
Mar 31, 2024     line clamp blocks - (8 hours)       Category: Hydraulics
Made some of the line clamps out of nylon


 