Project: rscreen   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Richard Screen   -  
Project:   Wag Aero - Sportsman 2+2   -   VIEW REPORTS
Total Hours:42.7
Total Flight Time:
Start/Last Date:Jan 01, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=rscreen

Home or Last Project Picture

Jun 15, 2020     Off-roading Wheels & Tires - (1.0 hour) Category: Landing Gear
Picked up a pair of off-roading wheels and tires.

These are 8:50x6. Not quite Tundra Tires, but they will take 90%+ of the off-road work that I intend to do.
 
Jun 01, 2020     4130 Chromoly Steel Order - (3 hours)       Category: Fuselage
After much to-ing and fro-ing with a local steel supplier, we managed to get on the same page with the 4130 chromoly steel necessary for the first part of the fuselage.

Although the actual per foot cost is a little higher than it would have been from Wag Aero, my overall cost including the shipping will be approximately $1000 less, because I can actually drive to the facility and pick up the order, rather than having to pay around $3000 for shipping.

I estimate my total cost of steel for the fuselage to be around $3800.00.


 
May 16, 2020     More Panel Fillers - (0.2 hour)       Category: Instrument Panel
Managed to drop on a brand new ASI for an awesome price. Also got myself a Turn Coordinator for a hundred bucks.


 
May 04, 2020     FIRST FULL CHORD WING RIB - YAYYYYY!!!!! - (4 hours)       Category: Wings
After a lot of preparation, I am, at last starting the wings. My first wing rib is up and ready for epoxy and gussets.


 
May 03, 2020     Clean up and Prep Shop for Fuselage Construction - (5 hours)       Category: Workshop
Cleaned up and prepped shop for Fuselage Construction Phase
Build a plans table
Put up shelving to store 4130 tubing.


 
May 02, 2020     More Tools - (2 hours)       Category: Tools
Purchase a number of essential tools to build the fuselage.
- Acetylene and Oxygen gas
- Tee Square
- Angle Finder
- Florian Pinkers


 
Apr 27, 2020     Cleaning up the workshop - (2 hours)       Category: Workshop
Did some cleaning up of the workshop. I should be building the build table for the fuselage very shortly. That will take up a great deal of space, so I need to get out as much unnecessary crap as possible.


 
Apr 26, 2020     Attitude Indicator and Compass Arrived - (0.1 hour)       Category: Avionics
Purchased a working AI off of eBay. I plan to get the aluminum sheet for my panel and start to lay it out.

The compass was purchased new from Wag Aero.


 
Apr 24, 2020     Finished the Wing Jig - (17.0 hours)       Category: Wings
This is the third iteration of the wing jig.

My first iteration was just not up to par, so I decided to scrap it and completely rebuild it.

My second iteration was much better, but still, I was not happy with it, given that Test Pilot, my family, my dog and I will be flying in it. I cannot risk an imperfect wing.

I feel much, much happier and confident in this version.


 
Apr 22, 2020     A few tools for the Project - (0.1 hour)       Category: Tools
Some of the tools I invested in to make this Sporty Gal


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.