Project: Percy'sRV-10   -  
            Last 30 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Percy Parker   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:2926.4
Total Flight Time:10.5
Start/Last Date:Apr 27, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Percy'sRV-10

Home or Last Project Picture

May 05, 2024     Blog Updates, May 05, 2024 - (.5 hour) Category: Research
Blog Updates for the week.
 
May 05, 2024     Flaps, May 05, 2024 - (3.5 hours)       Category: Fuselage
Flap motor and sensor wire connectors attached.


 
May 02, 2024     Cabin Doors, May 02, 2024 - (3.0 hours)       Category: Fuselage
Continuation of door liners fabrication. Did some touch-up on my first attempt.


 
May 01, 2024     Cabin Doors, May 01, 2024 - (2.9 hours)       Category: Fuselage
Continued fabricating the fiberglass backing for the door liners.


 
Apr 29, 2024     Blog Updates, April 29, 2024 - (5.2 hours) Category: Research
EAA Blog Updates.
 
Apr 27, 2024     Parts Purchase, April 27, 2024 - (0.3 hour) Category: Fuselage
Aerosport Products Headliner kit.
 
 
Apr 20, 2024     Parts Purchase, April 20, 2024 - (0.2 hour) Category: Fuselage
BID Fiberglass cloth from Aircraft Spruce.
 
Apr 19, 2024     Blog Updates - (1.1 hours) Category: Research
EAA Blog updates.
 
Apr 18, 2024     Center Armrest Console, April 18, 2024 - (1.9 hours)       Category: Fuselage
Fitting the center armrest. Preparation for making door liners.


 
Apr 18, 2024     Parts Purchase, April 18, 2024 - (0.25 hour) Category: Fuselage
Green Transparent tape for console lighting, Tan nylon retainers for door panel attachments.
 
Apr 15, 2024     Oxygen System, April 15, 2024 - (2.3 hours)       Category: Fuselage
Oxygen system wiring and connectors..


 
Apr 14, 2024     Overhead Console, April 14, 2024 - (.6 hour)       Category: Finish
Temporary installation to check space for new switches in the upper console for the external power relay switch.


 
Apr 10, 2024     Wiring, April 10, 2024 - (2.5 hours)       Category: Finish
Wiring. Performed wiring trace needed for answers to questions from Advanced Flight Systems. Also, determined how the external power connector and its relay would be integrated into the overall electrical system. The switch will be mounted to engage/disengage the relay to direct external current correctly. The light is an extra Taxi light to make sure the entire forward area is lighted. The light is a Pacifica Mini II by Aero. It will be mounted on the bottom of the engine cowl. It only require 0.33A to power.


 
Apr 09, 2024     Parts Purchase, April 09, 2024 - (.3 hour) Category: Finish
Wire for oxygen system. Shielded 22 GA 5-conductor wiring cable.
 
Apr 05, 2024     Parts Purchase, April 05, 2024 - (0.25 hour) Category: Finish
12-PIN weatherproof connectors for control grips and 12V distribution block from Amazon.
 
Apr 05, 2024     Parts Purchase, April 05, 2024 - (0.4 hour) Category: Avionics
3M Autoglass Urethane windshield adhesive for future application of windows.
 
Apr 05, 2024     Heating, April 05, 2024 - (2.1 hours)       Category: Finish
Heat SCAT and center armrest. Finished installing the SCAT. I realized that I would need to a way for the oxygen tubes and electrical wire to go to the aft battery compartment. Putting a hole in the center console deck under the armrest was my answer.


 
Apr 04, 2024     Battery, April 04,2024 - (4.8 hours)       Category: Finish
Main battery cable installation. Purchased 8 AWG battery cable wire from Amazon. I was able to thread the cables through the conduit and passthrough holes already in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.