EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
JSPatrol
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (68)
Research
- (1)
Workshop
- (5)
Empennage
- (14)
Fuselage
- (30)
Firewall
Tail Feathers
Wings
- (4)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
- (12)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (2)
Builder Name:
Jacob Carmer
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
227.2
Total Flight Time:
Start/Last Date:
Jun 27, 2020 - No Finish Date
Engine:
O-360
Panel:
GRT Avionics
Friendly URL:
https://eaabuilderslog.org?s=JSPatrol
Home or Last Project Picture
Sep 12, 2020
Welded the right elevator mount bushings into the right stab & fabricated the trim tabs & lower horizontal stab strut mount
- (4 hours)
Category: Empennage
Welded the right elevator mount bushings into the right stabilizer. Started fabricating the trim tabs and lower horizontal stabilizer strut mount and tack welded it.
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
8.jpg
9.jpg
Sep 11, 2020
Finished fabricating and tack welding the right elevator
Category: Empennage
Finished fabricating and tack welding the right elevator.
01.jpg
02.jpg
03.jpg
04.jpg
05.jpg
06.jpg
Sep 10, 2020
Made hinges for right elevator & match drilled holes for left elevator
- (1.5 hours)
Category: Empennage
Made the hinges for the right elevator and match drilled the holes for the left elevator
1.jpg
2.jpg
Sep 09, 2020
Fabricated and tack welded the first elevator
- (4 hours)
Category: Empennage
Fabricated and tack welded the first elevator
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
Sep 08, 2020
Added cross supports in the vertical and horizontal stabs and drew lines for building the elevators
- (2.5 hours)
Category: Empennage
Added cross supports in the vertical and horizontal stabilizers and laid out the lines for building the elevators.
01.jpg
02.jpg
03.jpg
Sep 07, 2020
Tack welded together the vertical stabilizer
- (4 hours)
Category: Empennage
Tack welded together the vertical stabilizer! It's looking more and more like an airplane
1.jpg
2.jpg
3.jpg
4.jpg
Sep 06, 2020
Finished making the horizontal stabilizer mounts
- (2 hours)
Category: Empennage
Finished making the horizontal stabilizer mounts
1.jpg
2.jpg
Sep 04, 2020
Finished welding send horizontal stab and fabricated mounting brackets
- (4 hours)
Category: Empennage
Finished welding the second horizontal stabilizer. Started fabricating the mounting brackets for the horizontal stabilizers. Hung them, temporarily, just to see how they will look.
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
Sep 03, 2020
Fabricated second of the horizontal stabilizers and finished welding of first
- (4 hours)
Category: Empennage
Finish welding on the first horizontal stabilizer and tack welded the second horizontal stabilizer together. Compared two stabilizers to make sure they are identical.
1.jpg
Sep 02, 2020
Fabricated one of the horizontal stabilizers
- (4 hours)
Category: Empennage
Fabricated one of the horizontal stabilizers
1.jpg
2.jpg
3.jpg
4.jpg