Mar 08, 2024     CB Wiring - (9 hours)       Category: Avionics
Started wiring the CB for powering the electricals.


 
Mar 07, 2024     Batterys - (6 hours)       Category: Instrument Panel
Connected Contactors and wired battery
Circut breakers and switches next


 
Mar 07, 2024     Farings - (8 hours)       Category: Farings
Made farings and installed Factor Strut faring


 
Feb 25, 2024     Contiued mounting Control horns on Elevator - (8 hours)       Category: Tail Feathers
Installed Elevator control horn and installed Autopilot Trim Tab


 
Feb 18, 2024     Reskinned the Elevator - (8 hours)       Category: Tail Feathers
Since I am installing the iLevel/Aircraft Automation I didnt want to have 2 trim tabs on the elevator, so I had Zenith make me up a elevator skin with out the cut out for the trim tab so that I could instal the trim servo that will operate the autopilit pitch. This also provides auto trim along with the autopilot nfunction. This trip out to the hangar I was able to complete the reskin and mount it to the horizontal stab, Next week I will complte the full rebuild which will include the control horns.


 
Oct 29, 2023     Mounted new panel and more cleaning - (6 hours) Category: Instrument Panel
Today I did a bit more cleaning and also transferred the mounting holes to the new panel. I used less screws this time, but I might add the others still. I will decide this prior to painting it. I have a few more items to look at before starting the wiring again, but in the next 2 weeks, I should be able to get the panel finalized and painted in prep for wiring everything all over again. This project will probably take about 2 weeks. Then I can get the engine running again. This will be good since it has been sitting for about 1 year.
 
Oct 15, 2023     Clean up day - (6 hours) Category: Workshop
Today was a clean-up day. Since It had been a month or 2 since I had been out to the hangar to do any real work, I decided to take the day and do a good cleanup in prep for the coming weeks to really push. I also took a good look at what I needed to get done to move forward.
 
Jun 04, 2023     Panel and Electrical redo - (6 hours)       Category: Avionics
Started to plan out the new panel and layout for terminals and electricals. Installed new switches and took a lot of measurements.


 
May 30, 2023     Panel option redue - (3 hours)       Category: Avionics
Redesigned Panel to accommodate new AP and Trim setup. I am still debating using the GRT EFIS or swapping it to an iPad with the BOM as primary. The AP head unit can act as a PFD.


 
May 28, 2023     Clean Slate - (6 hours)       Category: Avionics
I started pulling Avionic to redo the wiring behind the panel. I was not happy with the current layout of the wiring.
I also purchased an ECOAutopilot from Aircraft Automation. This will use trim tabs to control my aircraft including auto trim and full autopilot modes (GPS and 2D)


 
May 07, 2023     Electrical redo - (6 hours)       Category: Fuselage
Relocated the Batteries to the space under the passenger seat. this will bring the weight aft and also provide easy servicing.


 
Dec 23, 2022     Passenger Door - (8 hours)       Category: Fuselage
Started assembly of the passenger side door.


 
Jan 01, 2023     Wiring from Wing to Panel - (9 hours)       Category: Lighting
Today I routed the wiring from the wings to the panel so that I can start connecting the power and Magnetometer.
Connected Nav and Strobs.


 
Dec 30, 2022     Final Fitting of Windscreen - (16 hours)       Category: Fuselage
Today I completed the final fitting of the windscreen.. Final cutting and cleaning. Man, the glue they used sucks.


 
Dec 28, 2022     Final Assembly of Passenger door - (5 hours)       Category: Fuselage


 
Dec 27, 2022     Pilot Door Final assembly - (5 hours)       Category: Fuselage
Final Assembly of Pilot Door after paint.
Installed on Fuselage


 
Dec 26, 2022     Painted Door frames and Parts - (8 hours)       Category: Fuselage


 
Dec 22, 2022     Decals Installed - (6 hours)       Category: Paint / Decals
ATD made me some more decals to finish off the dress of the plane.


 
Dec 12, 2022     Passenger side door - (8 hours)       Category: Fuselage
Built passenger side door frame. Next will be drilling for plexiglass and then prep both door frames for paint.


 
Dec 04, 2022     Reconnected fuel lines - (8 hours)       Category: Fuel System
Reconnected fuel lines from wing to fuselage. Made aluminum plates for access panel


 
Dec 03, 2022     Reinstalled Wings after paint - (7 hours)       Category: Wings
Had some friends come over to assist in reinstalling the wings. I also mounted the Flaperons and connected the linkage. I still need to set the throw. Tomorrow I plan to complete the passenger door and then begin rigging the tail controls so I can permanently mount the tail feathers.


 
Nov 27, 2022     Painted both wings - (30 hours)       Category: Paint / Decals
Completed painting the wings and the struts. Install hinge for passenger side door.


 
Nov 07, 2022     Painting Tail feathers - (16 hours)       Category: Paint / Decals
This weekend I bought some 2x4s to build hangers for parts while i paint them. These will also serve to hang the wings when ready to paint next weekend.


 
Oct 29, 2022     Disassembly - (8 hours)       Category: Wings
I removed my wings with some help to begin preparing them for paint. I also removed the tail feathers. I now have a lot of paint prep. While the wings are off i installed all the rivets that I missed (3) during initial build. Added space for easy access to forward wing bolts


 
Oct 30, 2022     Re did fuel channels - (8 hours)       Category: Fuel System
Removed headliner material, cleaned off glue and primed and painted. I wrapped fuel line with silicone heat protection tube for chaff protection. Labeled fuel nipples on fuselage, replace rubber grommets with plastic snap ring and re secured.


 
Oct 23, 2022     Nose Strut Spacer - (4 hours)       Category: Landing Gear
Install the Viking Aircraft nose strut Spacer to bring the nose 2in.up


 
Oct 09, 2022     Installed Flaperons - (8 hours)       Category: Controls
Next step is to disassemble and prep for paint.


 
Oct 02, 2022     Flaperons - (9 hours)       Category: Controls
Completed the construction of Passenger side Outboard and Both inboard flaperons. Next week will begin mounting and preliminary rigging so that I can prepare to disassemble and prep for paint of remaining parts, Wing, Horizontal, Vertical etc…


 
Oct 02, 2022     Stabilizer end cap - (16 hours)       Category: Tail Feathers
I built end caps for the horizontal stabilizers. These are designed using the EAA article. It noted that they should be no more than a 1/4 of the root. The root is 4in so I made the airfoil of the tip 1in. this will allow the airflow to stay over the elevator at low airspeeds and reduce vortices making the elevator more effective.


 
Sep 26, 2022     Building of Flaperon (part1) - (6 hours)       Category: Controls
Started assembling the pilot side O/BFlapperon


 
Sep 10, 2022     Fiberglass Fairing - (8 hours)       Category: Wings
Had to redo my passenger side fairing. I seemed to have missed the resin in the incorrect ratio. The Pilot side came out great. i have trimmed and filled it with a micro glass sphere and epoxy resin to fill the holes. Next will be sanding.


 
Sep 03, 2022     Inner wing skins - (16 hours)       Category: Wings
Completed passenger and pilot side inner wing skins. Made fiberglass fairings for the leading-edge joints.


 
Jul 30, 2022     Radio installed - (8 hours)       Category: Avionics
Installed and tested the Radio system. Installed headset/PTT switch. All works. When the engine is running and Atl Field is on, I get a slight wine sound. will test a filter to see if reduces.


 
 
Aug 27, 2022     Root Wing Skin - (8 hours)       Category: Wings
Started working on inner wing skin on pass. side wing. Will need to complete Pilot side and then make fiberglass fairing.
Also completed wiring on Pilot grip. Added elevator trim control to grip.


 
Jul 28, 2022     Installed Pilot Nav/Strobe - (4 hours)       Category: Lighting
Installed Nav/strobe on pilot side wing. Also completed wiring in Pilot wing, Nav?Strobe, Landing light, and Pitot Heat.


 
Jul 28, 2022     Pilot Wing tip - (4 hours)       Category: Wings
Installed Pilot side Wing Tip.


 
Jul 27, 2022     Parking Brake - (4 hours)       Category: Controls
I have installed parking brake control cable.I am unhappy with the installation and will redo it once a new cable arrives.


 
Jul 25, 2022     Steering Linkage - (5 hours)       Category: Controls
installed steering linkage and started to decide on routing of wiring from wing to fuselage. Completed EFIS Mod Per manufacture


 
Jul 25, 2022     Mount for Headsets - (4 hours)       Category: Avionics
Installed headset mounts and installed fuel flow sensors


 
Jul 04, 2022     Static System/BU levil BOM Install - (8 hours)       Category: Avionics
Installed Levil BOM for AHRS BU. Finished installing Static port(S) nees to run static line to front of Aircraft to connect to EFIS and EIS.


 
Apr 04, 2022     EIS Sensor Terminal - (6 hours)       Category: Instrument Panel
Installed terminal block for EIS Sensors. Installed Data Plate.


 
Mar 27, 2022     Fuel tanks and fuel line - (8 hours)       Category: Fuel System
Completed routing fuel line from main wing tanks to the header tank. Few more holes to drill and will be fully set up and ready for testing for leaks.


 
Mar 24, 2022     Finished up the Dorsal - (6 hours)       Category: Tail Feathers
Completed the mount for dorsal on the Vertical fin


 
Mar 25, 2022     Viking Aircraft Fuel Sender - (16 hours)       Category: Fuel System
Installed the fuel sender inserts from Viking Aircraft Co. they are ~1in lower allowing for installation of the fuel senders on the top of the tank.


 
Mar 20, 2022     Dorsal Fin and Access panel - (7 hours)       Category: Tail Feathers
I did more trimming to allow for a better fit of the dorsal fin around the horizontal stabilizer. Also installed an access panel to allow for easy inspection of the elevator pulley.


 
Mar 19, 2022     replaced the nose strut - (6 hours)       Category: Landing Gear
Today I replaced the factory nose strut with a 2in longer one from Zenith Aircraft to allow more prop clearance. Went from 2-3in to 9in.


 
Mar 12, 2022     Fuel Trailer - (3 hours)       Category: Fuel System


 
Mar 06, 2022     Building Fuel Trailer - (8 hours)       Category: Tools
Started assembly of fuel cart for AutoGas for the plane. The trailer is a DIY Kit from Lowes. I added 4x8 3/4in plywood and coated it in Bedliner paint to protect it from water and fuel damage.


 
Jan 16, 2022     Mounted Tail - (16 hours)       Category: Tail Feathers
Over this past weekend i installed the horizontal and vertical stablizer. They are temp. Since i will be painting them while off the aircraft. Incidence of Horizontal is set to -0.9 deg. Which is with in. Tolerences of the plans. The mounting L-Angle is installed to allow mounting of the vertical stab to. The horizontal.


 
Jan 09, 2022     Corrected dihedral - (8 hours)       Category: Wings
Today I fixed the mistake I made on the struts. Here are the steps to correct the issue I created.
1. Level aircraft
2. run string from one wingtip to the other.
3. set wing height to 85mm =/-5mm at inboard rib.
4. Mount struts lose to get correct length.
5. mark holes for weldment and strut.
5. drill holes and then remount.
6. check dihedral (1.3 deg. on both wings)
7. repeat on other wing.


 
Jan 01, 2022     Struts and mounting bolts - (9 hours)       Category: Wings
Mounted struts, Cut ended 1 in short and will need to correct to achieve correct dihedral. Started building fuel cart. Hangar leaks covered plane to prevent damage.


 
Dec 29, 2021     Mounted wings - (8 hours)       Category: Wings
Today I had a few friends come over and help mount the wings to the fuselage. We mocked up the wings in so that i can perform all measurements to get the wings square, set incidence, and then finally dihedral.


 
Dec 20, 2021     Started left wing - (9 hours)       Category: Wings
Riveted the left wing skeleton together


 
Dec 16, 2021     Hobbs meter and Flap switch - (2 hours)       Category: Instrument Panel


 
Dec 16, 2021     Sunroof Install - (8 hours)       Category: Fuselage
Installed the replacement sunroof.


 
Dec 05, 2021     Installed windscreen - (5 hours)       Category: Fuselage
Today I worked on getting the windscreen trimmed and fitted to the fuselage. Went well. Started drilling and fitting the sunroof on. All went well and then the dreaded sound of Lexan cracking. I had to order a new sunroof.


 
Nov 28, 2021     Installed Landing Light in Right wing - (8 hours)       Category: Lighting
I cant an access panel to install the landing light to. I will need to add some L-angles to stiffen the panel to reduce flex when flying.


 
Nov 06, 2021     Continued right wing - (16 hours)       Category: Wings
Completed wiring for right wing. Mounted remote magnetometer. Wiring all runs along the trailing edge. Completed sheeting the wing top and bottom. Left inboard skin and trailing edge clecoed until after wings are mounted.


 
Oct 24, 2021     Started skeleton of Right Wing - (8 hours)       Category: Wings
Started assembling the right-wing skeleton.


 
Oct 31, 2021     Right wing continued - (9 hours)       Category: Wings
Completed skinning the bottom of the right-wing, next is wiring.


 
Oct 26, 2021     Color Scheme       Category: Interior Finish


 
Sep 06, 2021     Started wiring the Avionics - (16 hours)       Category: Avionics
For this log entry, I started wiring the avionics in the Cruzer. I mainly wanted to get the EFIS connections with the G175 Garmin, and the the Trig 22 Mode S transponder. I did run into 2 issues. I accidentally connected the Serial out of the ARINC to the EFIS to the In and vise versa. I found the mistake by using a multi meter and checking the pins. I also forgot to wire the Remote on ground wire on the trig 22 transponder. I corrected this issue and all is now correctly working. I continued and installed the RF Cabling for the following antennas, Com radio, Transponder, and GPS Antenna. Attached is my wiring diagram i drew out for future reference.


 
Sep 08, 2021     Chip in prop       Category: Propeller
Today I discovered what looks to be a chip in the whirlwind prop. I have not dropped the prop nor has anything hit the prop. I have reached out to Viking Aircraft Engine and they are going to talk to Whirlwind to determine if it will need to be replaced.


 
Sep 05, 2021     Made Decals for air intake - (3 hours)       Category: Paint / Decals
Today I designed and cut out on my vinyl cutting machine.


 
Aug 29, 2021     Painted and installed Seat frames and Interior - (16 hours)       Category: Interior Finish
Today was a great day, I received my seats from Flightline Interiors LLC. I assembled and painted the frames. Once dry i installed the seats. the interior is made of ultra leather which is light weight and will last longer in the aircraft.


 
Jul 25, 2021     Cowl Continued - (5 hours)       Category: Engine
Since i cut the cowl too short. I had to correct the mistake and remount the lower cowl. The space between the spinner backplate and the cowl is not increased to 20mm. I plan on doing some bodywork to decrease the space. Started upper cowl.

While installing the lower hinge system for the cowling, the rivets need up close to the edge. I measured and determined while close, I was within the minimum of 1.5mm but not within the suggested 10mm from the edge on the skin. I had my friend (A&P Robert McCoy) inspect the issue and he determined that it will be safe.


 
Aug 21, 2021     Primed and Painted Cowling - (16 hours)       Category: Paint / Decals
I completed the priming and painting of the cowling. I added the decals as well.


 
Aug 21, 2021     First Start of Viking Engine - (4 hours) Category: Engine
Today I performed the first start of the Viking 130 engine. This was completed without the prop installed to make sure wiring was installed properly and also to make sure there were no leaks in the cooling system. All went smooth. I followed Viking Aircraft Engines' recommended start checklist.
 
Aug 11, 2021     Brake line covers - (2 hours)       Category: Landing Gear


 
Aug 01, 2021     Electrical of Engine/circuit breakers - (8 hours)       Category: Engine
Completed wiring the circuit breakers for the engine power. Wired switches for engine controls. Installed dual throttle. Installed engine sensor wiring.


 
Aug 07, 2021     Electrical completion for Engine - (8 hours)       Category: Engine
Painted radiator shroud and installed fuel line from the header tank to engine.
I painted the new 2in longer nose strut and completed installing the fuel line from header to Engine.


 
Aug 14, 2021     Cowl Work - (16 hours)       Category: Engine
Completed some bodywork on the cowling to correct the gap between the cowling and the spinner. I also shortened the exhaust pipe to the recommended 2in length.
Pick foam was used to mold the front of the cowling to match the spinner then 2 layers of 2oz fiberglass and epoxy resins were used to bond.


 
May 25, 2021     Corrected Radiator plumbing - (2 hours)       Category: Engine
I made the following corrections to the Radiator plumbing.
Mounted overflow is lower than the cap.
Installed clamps.


 
May 23, 2021     Radiator Plumbing - (4 hours)       Category: Engine
Installed radiator hose and mounted ECU. Installed GRT Engine sensors. Coolant Temp, Oil Pressure, Gearbox temp.


 