EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MartinezCruzer
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (135)
Research
- (6)
Workshop
- (8)
Empennage
- (36)
Fuselage
- (58)
Firewall
Tail Feathers
- (7)
Wings
Controls
- (12)
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
- (1)
Inspection
Tools
- (7)
Builder Name:
Carlos Martinez
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
298.6
Total Flight Time:
Start/Last Date:
Sep 05, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=MartinezCruzer
Home or Last Project Picture
May 16, 2024
Gear Mounts
- (2 hours)
Category: Fuselage
Measured, drilled, and clecoed L angle to inside of fuselage for right gear mount bracket.
IMG_2701.jpeg
May 13, 2024
Aircraft Dollies
- (2 hours)
Category: Workshop
Built a new larger dolly for the front, disassembled the previous dolly, and redesigned and rebuilt iit to hold up the tail.
IMG_2694.jpeg
May 11, 2024
Flaperon controls
- (1 hour)
Category: Controls
Connected flaperon control arms to torque tube.
IMG_2693.jpeg
May 05, 2024
Aircraft dolly
- (4 hours)
Category: Workshop
Designed and built rolling dolly from materials recycled from a shipping crate. Transferred fuselage to dolly and a pair of sawhorses to facilitate access for construction.
IMG_2688.jpeg
Apr 28, 2024
Gear Mounts
- (2 hours)
Category: Fuselage
Measured, drilled, expanded to final size, and clecoed landing gear mounting brackets in place.
IMG_2672.jpeg
IMG_2671.jpeg
Apr 22, 2024
Controls
- (3 hours)
Category: Fuselage
Fitted, drilled, deburred, and riveted brake pedals to rudder pedals and installed them in the cabin.
IMG_2666.jpeg
Apr 21, 2024
Cabin Frame
- (3 hours)
Category: Fuselage
Fitted, drilled pilot holes, expanded them to size 20, and clecoed the cabin frame to the fuselage.
IMG_2665.jpeg
IMG_2664.jpeg
Apr 17, 2024
Polished Aluminum Finish
- (2 hours)
Category: Paint / Decals
Purchased a Flitz kit for putting a polished aluminum finish on the airplane and applied it to the rudder.
IMG_2655.jpeg
IMG_2658.jpeg
IMG_2659.jpeg
Apr 16, 2024
Controls
- (2 hours)
Category: Fuselage
Measured, drilled, deburred, corrosion-protected, and clecoed forward torsion bar bearing.
IMG_2652.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.