Project: jplummer   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:James Plummer   -  
Project:   Kolb - Firestar   -   VIEW REPORTS
Total Hours:976
Total Flight Time:
Total Expense:$41129.00
Start/Last Date:Sep 16, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=jplummer

Home or Last Project Picture

Apr 23, 2024     Get Ready For Paint Etc. - (30 hours)       Category: Workshop
Move And Suspend Components In Preparation For Paint Including Anti UV applications


 
Feb 02, 2024     Left Wing ready for UV paint etc. - (25 hours)       Category: Wings
Following Brian Melborn's U tube instructions I have completed the 350 degree heat stretch and poly brush application. The fabric is tight and neat.


 
Dec 01, 2023     Covering The Left Wing - (75 hours)       Category: Wings
Following Bryan Melborn's U tube instructions I have been covering this wing a few more steps remain.


 
Jul 07, 2023     One Covered One To Go - (99 hours)       Category: Wings
Rivets and tapes went well , Now we cover the left wing. Also on control surfaces etc we spray poly fiber UV spray.


 
May 22, 2023     Right wing almost covered ! - (75 hours)       Category: Wings
Covering right wing following Brian Melborn's U tube and telephone instructions 95% completed.


 
Mar 06, 2023     Busy with house projects will resume when possible - (05 hours) Category: Not Active
Will get back to the Kolb soon.
 
Dec 08, 2022     Started Wing Covering Following KOLB Online Instructions - (100 hours)       Category: Wings
After reviewing Bryan Melborn's online youtube instructions I have begun covering the right wing. I rigged up a sling so that I can flip the wing over as needed.


 
Aug 07, 2022     Poly Brush Applied To All Control Surfaces - (030 hours)       Category: Controls
Poly Brush applied, color and supplies purchased.


 
Jun 01, 2022     Finish Aileron Covering - Install Engine Lift In Shop - (88 hours)       Category: Controls
Completed Covering and initial heat stretch of aileron covering.
Installed engine lift in shop to safely lift inspect and install engine on airframe.


 
Mar 09, 2022     Aileron Fabric Covering (Right Aileron) - (65 hours)       Category: Not Active
Fabric Covering Of Right Aileron a difficult task.
This step took many hours but was accomplished
on 03/08/2022,


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.