EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
jplummer
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (18)
Research
- (3)
Workshop
- (1)
Empennage
Fuselage
Firewall
Tail Feathers
- (3)
Wings
- (6)
Controls
- (2)
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Not Active
- (3)
Builder Name:
James Plummer
-
Project:
Kolb - Firestar
-
VIEW REPORTS
Total Hours:
976
Total Flight Time:
Total Expense:
$41129.00
Start/Last Date:
Sep 16, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=jplummer
Home or Last Project Picture
Apr 23, 2024
Get Ready For Paint Etc.
- (30 hours)
Category: Workshop
Move And Suspend Components In Preparation For Paint Including Anti UV applications
IMG_0442.jpeg
IMG_0441.jpeg
Feb 02, 2024
Left Wing ready for UV paint etc.
- (25 hours)
Category: Wings
Following Brian Melborn's U tube instructions I have completed the 350 degree heat stretch and poly brush application. The fabric is tight and neat.
Left Wing.jpeg
Dec 01, 2023
Covering The Left Wing
- (75 hours)
Category: Wings
Following Bryan Melborn's U tube instructions I have been covering this wing a few more steps remain.
IMG_0407.jpeg
Jul 07, 2023
One Covered One To Go
- (99 hours)
Category: Wings
Rivets and tapes went well , Now we cover the left wing. Also on control surfaces etc we spray poly fiber UV spray.
IMG_0377.jpeg
May 22, 2023
Right wing almost covered !
- (75 hours)
Category: Wings
Covering right wing following Brian Melborn's U tube and telephone instructions 95% completed.
IMG_0367.jpeg
Mar 06, 2023
Busy with house projects will resume when possible
- (05 hours)
Category: Not Active
Will get back to the Kolb soon.
Dec 08, 2022
Started Wing Covering Following KOLB Online Instructions
- (100 hours)
Category: Wings
After reviewing Bryan Melborn's online youtube instructions I have begun covering the right wing. I rigged up a sling so that I can flip the wing over as needed.
IMG_0318.jpeg
IMG_0321.jpeg
Aug 07, 2022
Poly Brush Applied To All Control Surfaces
- (030 hours)
Category: Controls
Poly Brush applied, color and supplies purchased.
IMG_0293.jpeg
Jun 01, 2022
Finish Aileron Covering - Install Engine Lift In Shop
- (88 hours)
Category: Controls
Completed Covering and initial heat stretch of aileron covering.
Installed engine lift in shop to safely lift inspect and install engine on airframe.
IMG_0281.jpeg
IMG_0279.jpeg
Mar 09, 2022
Aileron Fabric Covering (Right Aileron)
- (65 hours)
Category: Not Active
Fabric Covering Of Right Aileron a difficult task.
This step took many hours but was accomplished
on 03/08/2022,
Right Aileron 1.jpeg
Right Aileron 2.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.