EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
msmst25
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (47)
Research
Workshop
Empennage
- (11)
Fuselage
- (36)
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Matthew McCoy
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
Total Flight Time:
Start/Last Date:
Oct 12, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=msmst25
Home or Last Project Picture
Apr 15, 2021
Fiberglass work on the empennage fairings
Category: Empennage
Continuing fiberglass work on the fairings and attaching fairings. Had to start over after the first attempt. One layer of glass wasn't strong enough to support the structure.
C1EBA451-FE5E-4FEA-A3D4-B07B8F149AC9 2.jpg
C52F431B-CF01-4726-AC3F-A8F79694D012 2.jpg
CC6C9DD5-3684-4733-BD77-62757081F8E1 2.jpg
IMG_1822 2.jpg
IMG_1827 2.jpg
IMG_1836 2.jpg
Mar 28, 2021
Cabin cover
Category: Fuselage
Continue to drill and countersink holes for cabin cover. Used right angle drill for countersinking.
IMG_1671.jpg
IMG_1666.jpg
IMG_1667.jpg
IMG_1668.jpg
IMG_1669.jpg
IMG_1670.jpg
Mar 26, 2021
Cabin cover and shim for baggage door
Category: Fuselage
Continue fitting cabin cover. Match drilling cabin cover. Installed shim for baggage door top to skin joint.
IMG_1642.jpg
IMG_1643.jpg
IMG_1644.jpg
Mar 06, 2021
Rear seat backs, flap motor, flap control
Category: Fuselage
Install PH Aviation Flap motor. Assemble and install rear seat backs. Attach and seal brake lines.
3A580CDE-7E95-4C84-9877-549A6B053724.jpeg
A86C1EE0-5488-4D13-A126-7BACA48D7D4E.jpeg
EB3ACFB7-3DF3-424E-AD33-BB39475118CB.jpeg
IMG_1328.jpeg
IMG_1329.jpeg
IMG_1330.jpeg
IMG_1349.jpeg
IMG_1350.jpeg
IMG_1351.jpeg
IMG_1352.jpeg
IMG_1353.jpeg
IMG_1354.jpeg
IMG_1388.jpeg
IMG_1400.jpeg
IMG_1406.jpeg
IMG_1408.jpeg
IMG_1469.jpeg
Feb 22, 2021
Flap motor and controls and rear seats
Category: Fuselage
Building brackets for PH Aviation flap motor. Assembling and drilling rear seat backs. Assembling control mechanisms
95F40052-94F2-4F96-8BF2-F5B59054656E.jpeg
B31B8687-D564-430B-8B57-99B200AAC715.jpeg
4E6A8392-8EE4-4539-A783-5D7EE838FA16.jpeg
2AF19204-459B-4B85-AD47-EB27D900EA46.jpeg
IMG_1234.jpg
IMG_1241.jpg
IMG_1243.jpg
IMG_1244.jpg
IMG_1251.jpg
IMG_1253.jpg
IMG_1254.jpg
IMG_1255.jpg
Feb 09, 2021
Brake and rudder pedals
Category: Fuselage
Assemble and install brake lines from TS Flightlines
48B02C20-B19B-448D-B6FE-358395DEAFCE.jpeg
5CACE43B-7988-47C7-99D5-5018EE851112.jpeg
73C13498-B1B1-4D23-853C-E6999627B739.jpeg
A79875C9-426D-4572-B43D-3F22BD9CA993.jpeg
D98EE5CC-8020-409C-A01F-21951442ABE0.jpeg
B804108E-C1F5-45B2-86C0-A51DD84F7658.jpeg
11B92034-EB86-4878-9BFF-AACDF8CFB2C8.jpeg
F133F536-9682-4E03-A412-F079218D9A4A.jpeg
251617A3-74CC-4E18-9DB9-42A78247E8C3.jpeg
93B97155-6F2A-4CBD-B3EA-16FF835BA65A.jpeg
013BB14E-11B5-47C2-858A-CF6B4FF975AB.jpeg
Jan 12, 2021
Baggage floors, access panels
Category: Fuselage
Spent most of a week designing and fabricating and install access panels. Installed doubler for comm antenna. Installed conduit.
63211852489__451F28FE-A4E6-4AA2-95B5-5BAECE116F5C.jpg
IMG_1038.jpg
IMG_1039.jpg
IMG_1051.jpg
IMG_1058.jpg
IMG_1060.jpg
IMG_1067.jpg
IMG_1072.jpg
IMG_1075.jpg
IMG_1078.jpg
Jan 03, 2021
Attached tailcone
Category: Fuselage
Section 32
Tailcone attached
513C8B83-78FC-4BB9-95A1-7F3C58C77034.jpg
IMG_0969.jpg
IMG_0977.jpg
IMG_0997.jpg
IMG_1002.jpg
Jan 03, 2021
Upper forward fuse
Category: Fuselage
Section 32
Completed the upper forward fuselage subassembly.
417B0692-2049-4460-BF09-267C31A2FB45.jpg
8AC46CA9-7ED1-4435-ACC2-1457682C70AF.jpg
IMG_0904.jpg
IMG_0905.jpg
IMG_0916.jpg
IMG_0918.jpg
IMG_0926.jpg
IMG_0936.jpg
IMG_0978.jpg
IMG_0979.jpg
IMG_0998.jpg
Dec 19, 2020
Section 29 complete
Category: Fuselage
Section 29
Final rivets for section 29. Had to use a few cherrymax rivets for hard to reach spots. Floor panels installed. Landing gear mounts installed. Repaired the dent after dropping bucking bar.
67C6CCC3-CE70-45F2-ABAA-F63501D07375.jpg
E0D537B9-3353-4163-949E-1E63D19E01DF.jpg
IMG_0840.jpg
IMG_0856.jpg
IMG_0857.jpg
IMG_0858.jpg
IMG_0862.jpg
IMG_0864.jpg
IMG_0867.jpg
IMG_0870.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.