Project: DR_DAVE'S_RV-10   -  
            All Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DAVE LEHMAN   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:451.1
Total Flight Time:
Start/Last Date:Oct 01, 2020 - Feb 03, 2026
 
Friendly URL: https://eaabuilderslog.org?s=DR_DAVE'S_RV-10

Home or Last Project Picture

Apr 04, 2024     Upper Rear Skin attached - (1 hour)       Category: Empennage
Been working on her since returning home on the 26th. Need to add those log entries. Meantime, I attached the rear top skin before heading out of town, pretty easy to carefully fold over, used Gorilla tape to hold down as I cleco'd it into place. Now on a short trip, then down to Florida for the Sun-n-Fun 2024.


 
Mar 26, 2024     LCP replacement Parts - (2 hours)       Category: Wings
Unwrapped and inventoried replacement parts from LCP anomaly. 48 individual items replaced.


 
Mar 22, 2024     Been on the road       Category: Misc.
Been on the road since Feb. Stopped by to see these folks, but sadly, it was the weekend.... Oh, well. Hopefully I'm back into the shop next Tuesday 26th. We will see.....


 
Feb 17, 2024     More Empennage build - (1 hour)       Category: Empennage
..... and.... after making this part; the F-1011E Rudder Cable Angle. I immediately lost it somewhere in the shop.... or house.... or outside in the snow.. I don't know, but I know if I make another replacement, the original will promptly reappear. (Thanks Dad!)


 
Feb 17, 2024     Replaced Finished Assemblies on Wall - (2 hours) Category: Tail Feathers
Remounted finished assemblies to wall mounted shelves for earthquake prevention.
 
Feb 14, 2024     IA progress inspection - (2 hours)       Category: Tail Feathers
Page 9-20 Rev 1 Step 2 Safety Wiring piano hinge. Demo'd and taught by Al Hathy; EAA Tech counselor EAA #398190. Al demonstrated installation technique for safety wire. Al then supervised and approved my safety wiring of the second piano hinge piin. Al also inspected progress on finished vertical stabilizer, rudder, horizontal stabilizer, elevators and trim tabs.


 
Feb 11, 2024     Counterweight - (2 hours) Category: Tail Feathers
Page 9-20 Rev 1 Step 1
 
Feb 10, 2024     Elevator Counterweight - (2 hours) Category: Tail Feathers
Page 9-16 Rev 1 Step 1 thru 6, step 9 counterweight and extra weight installation per SB-00043 Torque 28 in/lbs (10 in/lbs and 8 in/lbs breakaway)
 
Feb 10, 2024     Riveting elevator trailing edges - (3 hours) Category: Tail Feathers
Page 9-15 Rev 1 Continued Step12 - Riveting elevator trailing edges
 
Feb 09, 2024     Riveting Elevator Trailing Edges - (3 hours) Category: Tail Feathers
Page 9-15 Rev 1 Step 11 & 12 Riveting elevator trailing edges
 
Jan 23, 2024     Riveting Hinge Halves to Elevator - (3 hours) Category: Tail Feathers
Page 9-19 Rev 1 Step 7 - Riveting the hinge halves to the elevator 2X sides
 
Jan 14, 2024     SB-00043 - (6.5 hours)       Category: Tail Feathers
SB-00043 for rear spars/skin area, what a potential mess, also 9-18 step 9 - trim tab foam insets, 9-16 step 7 - rier WD-415 to trim cable bracket, step 19 step 1-2, clean up.


 
Jan 13, 2024     SB-00043 more - (7.3 hours) Category: Tail Feathers
SB-00043 make v-supports, insert elevators, clean with vacuum, add clamps to skin-spar area where not riveted, prepped TE wedge, collected board, weights, etc
 
Jan 13, 2024     SB-00043 - (2 hours) Category: Tail Feathers
trim tabs - rivet spar to skins,
 
Jan 11, 2024     Trim Tabs - (3 hours) Category: Tail Feathers
trim tabs, prime area under the horns, prep elevators for SB-00043, trim tab horns riveted to skins and spars (lower only)
 
Jan 10, 2024     Riveting skins Category: Tail Feathers
rivet skins to spars except skins aft of rear spar E-1007 (for trailing edge wedge insertion later)
 
Jan 06, 2024     re-prime - (2 hours) Category: Tail Feathers
re-prime tip ribs, spar and counterweights
 
Jan 05, 2024     Trim tab trailing edges - (2.0 hours) Category: Tail Feathers
Trim tab trailing edge bends, need to touch up epoxy tip ribs, re-alodine scratches area on E-903
 
Jan 02, 2024     Begin prep for SB-00043 - (2.5 hours)       Category: Tail Feathers
Prep elevators for the SB-00043 sealant addition.


 
Nov 28, 2023     Elevator Trim Tabs - (6 hours)       Category: Tail Feathers
Bending of trim tabs at elevator. Note: I etch primed the overlap parts prior to this bend. Also final bend on elevator chord with old LCP Spars in place. (New Non-LCP spars are dimpled, machine countersunk and alodined, awaiting epoxy primer)


 
Aug 13, 2023     Elevator Assembly - Continued       Category: Tail Feathers
Ok. Back to the project. Used long bucking bar to install rivets on the rear spar of elevator. Not an issue at all, #3 rivet gun @ 37PSI. Used PVC pipe on pop- rivet squeezer for leverage on inner LP4-3 blind rivets. Rear spar LP4-3 bilnd rivets were easy with the Harbor Fright Pneumatic Squeezer. Front Spar a little difficulty with rolling rivets (mostly cosmetic, sorry Tony B) I think we need to use other longer dies for the pneumatic squeezer as I suspect the long travel may be the issue.


 
Aug 13, 2023     Van's Laser Drill Parts Update       Category: Misc.
Whew! I have lucked out on the LCP anomaly. My empennage kit was packed for shipping 9-2020, so well before this issue arose. Only 2X tail-feather items I need to replace are the 2 flap spars that countersunk wonky and were re-ordered. They had a build date of X-2022, thus affected. I had them ready to install and a close look with a 12X eye loupe shows small craters on the dimple (although no dimples have cracked). The wing kit, that came in March 2023 is a different story. Various items on the Van's RV-10 Wing Kit List are applicable. Tried some Section 5 techniques to affected Flap Ribs, but still look like heck. The holes are not circular and are barely below the maximum diameter after working the defects out. Sample dimpling did not crack the rib dimple hole but there is lots of slop in the hole when a sample -3 rivet is installed.


 
Aug 13, 2023     Van's Laser Drill Parts Update Category: Misc.
Whew! I have lucked out on the LCP anomaly. My empennage kit was packed for shipping 9-2020, so well before this issue arose. Only 2X tail-feather items I need to replace are the 2 flap spars that countersunk wonky and were re-ordered. They had a build date of X-2022, thus affected. I had them ready to install and a close look with a 12X eye loupe shows small craters on the dimple (although no dimples have cracked). The wing kit, that came in March 2023 is a different story. Various items on the Van's RV-10 Wing Kit List are applicable. Tried some Section 5 techniques to affected Flap Ribs, but still look like heck. The holes are not circular and are barely below the maximum diameter after working the defects out. Sample dimpling did not crack the rib dimple hole but there is lots of slop in the hole when a sample -3 rivet is installed.
 
Jul 24, 2023     Oshkosh 2023       Category: Misc.
Took some time for a week in Wisconsin and 4-days at Oshkosh. Got dang hot Thursday! Stayed at a house about 5-mins from the venue. Had Warbird parking passes courtesy Paul Stojkov, my co-captain. Did the usual, plus the Van's "laser drilled parts" forum. See next post on parts from my new Wing Kit that are affected.


 
Jul 17, 2023     Duramax LBZ all back together       Category: Misc.
OK. Finally had the time to finish the LBZ head/engine rebuild. New heads/valves and gaskets, ARP studs, Turbo rebuilt with new 11-blade compressor wheel, new turbo intercooler and intake pipes, new exhaust manifolds with less restriction, new up-pipes, new down-pipe without the restriction, fuel lift-pump with pressure gauge, post CP3 high pressure fuel gauge, new fuel lines, fuel manifolds, injector pipes and 8 new Bosch OEM fuel injectors. Lots of power, cooler EGT's, too much Boost! (29"+)


 
Apr 17, 2023     Wing Kit Inventory - (3 hours)       Category: Wings
WhooHoo! Wing Kit came 2-months earlier than scheduled. Well it actually was here 6-Mar but bad weather in KSLC and my schedule of not being home delayed arrival to the shop by another month. Crates showed no damage. They replaced the large gold "demon" staples with smaller 1/4" staples. Lids came off easily. The packaging was phenomenal, parts stuffed in parts. A Vans Tetris Puzzle for sure. Inventory went well short just 1 pop rivet! All parts package for short term storage as we are still finishing the tail feathers. BTW the anodized spars are MONSTERS! Well made and a nice golden color.


 
Apr 05, 2023     Still rebuilding LBZ       Category: Misc.
OK. Turbocharger overhauled, new billeted compressor wheel. Have the new heads installed, the valve-lash adjusted, valve covers back on and the new injectors and glow plugs with a new high-pressure fuel rail assembly installed. Y-Bridge intake (red) was also installed, but had to replace OEM nuts with SS allen hex head screws and grind down the head of the aft passenger side screw to clear the compressor housing. I'm on the road flying now but back end of week (15-APR)


 
Mar 12, 2023     Putting Engine back together       Category: Misc.
Ok. Still no work on the RV-10. Finally all new engine parts in, rebuilt turbocharger and now putting engine back together. I have to fly this week so will not be back into shop until the end of March. Thank goodness for pictures of teardown. Just hope I don't have a bag of important looking stuff left over....


 
Feb 11, 2023     Taking a break for a diesel engine rebuild       Category: Misc.
Had to take valuable time away from RV-10 project to replace my 2006 Duramax LBZ Head gaskets before summer RV season. Failed head gasket (#7 cylinder) verified, thus a complete teardown of the upper end of diesel engine. 240,000 hard miles and 5800 hrs on her poor back. Road hard trailering the new Mothership 2.0, but she was never put up wet. New heads and gaskets, 8-new fuel injectors, new turbo compressor wheel (11-blade), new turbo bearings, new up pipes and removal of some tubing no longer desired. Hope to be back on RV-10 within a week or so. Ok, now it looks like March now.


 
Jan 03, 2023     Back Riveting Ribs to Skin - (3 hours)       Category: Tail Feathers
Getting pretty fast back riveting the -3.5 rivets used 35PSI #2 gun, for the -3's dropped it to 30PSI. All went well except found, after finishing the top right skin, there was a rib without sub-dimples, Ope! (Mary!!!!!) Drilled out 8 rivets without an issue, dimpled rib, then promptly set the 1st rivet at 90PSI! (wrong hose) Oh, well, something wrong on all sub assemblies will humble a builder.... just a slight deformation on the upper skin. in retrospect, I probably should have just left it alone the 90PSI rivet was pretty flat, but still had 7 nice rivets to take up the slack and it was in the center of the rib. Shhhhh!


 
Jan 02, 2023     Elevator Assembly - (9 hours)       Category: Tail Feathers
Started assembling Elevator, riveted Tip Ribs, had missed the 6X end dimples (can't use DRDT, needed pneumatic squeezer) Also, sub-skin dimpled 6X holes at skin/counterweight overlap. Seems rivets don't sit as flush after expoy primer, unsure if from under dimpled or excessive primer. So I re-dimpled one set of counterweight skins, appears to have helped. (Cannot feel any rivets with rub test before re-do, but was optically annoying) Ran short of about 5X -5 rivets for doublers. unsure why, maybe too many previous misteaks. Ground down a few -6 rivets to length to make up difference. Will order more just for stock. Elevator horns, little tough to install rivets into holes, again, suspect too much primer in holes, scraped out primer for install, and actually just reamed a few holes. Prepped back rivet plate and re-waxed.


 
Dec 30, 2022     Elevator and Trim Skin Dimple, Priming Innards - (12 hours)       Category: Tail Feathers
Mary dimpled the 4 elevator skins and the 2 trim skins. I prepped the paint booth for priming and added additional masking of rear spars for foam ribs. Epoxy primed all elevator and trim tab parts that were previously alodined. Counterweights trimmed, Fubar'd one weight, so I re CSK hole on other side and filled front side, each set weighs in at 1125 gms. Prepping the lead weights, rough cut weights on bandsaw with a 6-TPI blade. The blade normally used for cutting the aluminum ribs is a 24-TPI blade, too fine for lead. A farrier hoof rasp made short work of the remaining trimming, as well as the high ridge on the back side of two of the counterweights.


 
Dec 29, 2022     Prep and Alodine Elevator and Trim parts. - (7.5 hours)       Category: Tail Feathers
Alodine preparations, cleaned all metal with acetone. Alodined all elevator parts and trim spars/hardware, hanging to dry.


 
Dec 26, 2022     Etch Prime Elevator Skins - (7 hours)       Category: Tail Feathers
Elevator and trim tab skins prepped for Etch Priming with skins masked for foam ribs. Used orbital sander with maroon scotebright to clean off micro scratches. all parts primed with SW P60G2


 
Dec 24, 2022     Trim Tab Horns - (2 hours)       Category: Tail Feathers
Used opposite tab with cleco to mark cut lines on trim tab horn. Assures adequate hole spacing to edge.


 
Nov 30, 2022     HS Finished!! - (3.5 hours)       Category: Tail Feathers
Final Rivets of rear spar. Also, a slip with the bucking bar and the results - ope! At least it is on the bottom side.


 
Nov 29, 2022     Bottom Side HS - (3.1 hours) Category: Tail Feathers
Researching torque values, riveting skins
 
Nov 28, 2022     HS final steps - (3.5 hours)       Category: Tail Feathers
Ribeting Rear Spar to Skin; Drill out some bad rivets, primer touch up and installing hardware.


 
Nov 27, 2022     Bottom Skins - (1.5 hours) Category: Tail Feathers
Bottom Skin Rivets
 
Nov 25, 2022     Bottom Skins - (3.5 hours) Category: Tail Feathers
Bottom Skin Rivets
 
Nov 24, 2022     H Spar Rivering HS-1015 Stringer - (8 hours)       Category: Tail Feathers
Ah. The dreaded HS-1015 Stringer Invisible Rivets. I have been riveting in a horizontal position placing the frame on two banker boxes with a soft blanket to position. For the invisible rivets I balanced the tungsten rivet bar on my first two fingers and pushed up on the rivet. After placing the rivet gun on the skin, I reposition the rivet bar to "feel" a horizontal position. A known burst of the gun set the rivet to pretty darn close to what I wanted. I used a telescoping mirror to inspect results, all worked well! (Black Gorilla tape is used on bucking bar to protect stringer from damage.) PM me for a video of this technique if desired - dl


 
Nov 23, 2022     Bottom and Top Skins - (7.5 hours)       Category: Tail Feathers
Riveting Nose Ribs. After IA look of progress, installed forward spar with pop rivets and began riveting skin to forward spar.


 
Oct 29, 2022     Elevator Parts placement and Tip Ribs - (4.5 hours)       Category: Tail Feathers
Adjusted tip ribs for match counterbalance of skin. Bend closeout tabs and ream holes as necessary.


 
Oct 28, 2022     Elevator Gusset - (7 hours)       Category: Tail Feathers
Tip Ribs adjustment, really scratched up. Installed gussets and reamed holes to final size.


 
Oct 05, 2022     Tip Ribs - Long Day - (6.5 hours)       Category: Tail Feathers
OK. Spent considerable time tweaking the Inboard and Outboard nose ribs to straighten them so as to align to the Counterbalance Skin. Finally got what I deemed acceptable, Reamed the 3/32, 1/8 and 3/16 holes, no problem. (Page 9-2 Step 4-6) Then on to Step 7-8 for the Shear Clips. Finished the night with Page 9-3 Steps 1-3, for the Close-Out tabs. Used a part from a metal bending brake covered with blue painters tape to protect. DId NOT use rivet gun set on low, simply tapped with a piece of white oak scrap full length of tab.


 
Oct 04, 2022     Elevator Tip Ribs, Spar Adjustments - (1.0 hour)       Category: Tail Feathers
Verified spars were still at 90 degrees. Didn't like the looks of the original tip ribs from Vans (E-903, E-903), so I ordered replacements. These tip ribs are not much better, in pretty bad shape, scratches, some corrosion, serious Scotchbrite work was needed on them. I will Alodine and Epoxy prime but still, needed to repair before attempting to shape.


 
Oct 03, 2022     Elevator Ribs - (3.3 hours) Category: Tail Feathers
Still deburring and cleaning up Elevator Ribs
 
Oct 01, 2022     Elevator Ribs - Deburring - (2.3 hours) Category: Tail Feathers
Deburring Elevator Ribs Step 2
 
Sep 05, 2022     Elevator - (1.5 hours) Category: Tail Feathers
Page 9-2 Step 1. Used new 24TPI bandsaw blade to cut E-1008 Elevator Ribs into Parts A-B.
 
Sep 02, 2022     Front Spar and Nose Rivets - (1 hour) Category: Tail Feathers
Placement of Nose Ribs into skin in preparation for riveting.
 
Aug 27, 2022     Riveting Inspar Ribs and Stringer Web - (3.5 hours) Category: Tail Feathers
Page 8-10 Steps 1-2 To rivet Stringer and Stringer Web together; Page 8-11 Riveting the Inspar Ribs
 
Aug 26, 2022     Epoxy Priming HS Parts - (3 hours) Category: Tail Feathers
Epoxy Primed parts for HS
 
Aug 23, 2022     Countersinking Replacement Stringers - (3 hours) Category: Tail Feathers
Machine Countersink HS-1014 HS-1015 Replacement Stringers to 0.007" for skins.
 
Aug 22, 2022     New HS-1014 and HS-1015 Stringers - (2.3 hours) Category: Tail Feathers
Took replacement stringers and cut/deburred (Page 8-4 Steps 1-2)
 
Aug 19, 2022     HS Alodine Parts - (1 hour) Category: Tail Feathers
MAry's assistance, Alodined HS spars/ribs and misc parts
 
Aug 18, 2022     HS Stringer Web and Rear Spar - (1.5 hours) Category: Tail Feathers
Mary dimpled parts using the DRDT
 
Aug 17, 2022     Dimpling HS Parts - (4 hours) Category: Tail Feathers
Continuation of Page 8-9 Mary, my Wife, assisted in Page 8-9 Steps 1-8. For cleco assembly, drilling and dimpling (Mary dimpled all parts using the DRDT)
 
Aug 15, 2022     HS Stringers, Stringer Web and Rear Spar Assembly. - (3.0 hours)       Category: Tail Feathers
Mary, my Wife, assisted in Page 8-9 Steps 1-8. For cleco assembly, drilling and dimpling (Mary dimpled all parts using the DRDT)


 
Aug 14, 2022     More Riveting Progress - (10 hours)       Category: Tail Feathers
Page 8-6 step 1-2 for . Front Spar Doubler, Spar Caps, and HS-1008 (L-R) Front Spar Attachment Brackets. Page 8-8 Steps 1-8 for match drilling and reaming of holes. Screwed up the HS-1014 and HS-1015 Stringers by countersinking wrong holes. Ordered new parts from Vans (Got them in 3-days!!!)


 
Aug 03, 2022     Alodine and Prime HS Ribs - (8.5 hours)       Category: Tail Feathers
Prepped Ribs/Misc parts for Alodine Process, (Scotch Brite defects and Acetone wipe) Let parts cure for a few days before epoxy priming them, also (scotch brite was completed before dimpling) and primed inside of skins


 
Jul 03, 2022     In Europe for a little longer... Category: Misc.
Folks. I'm still traveling in Europe for my clients. Will be back in the shop late July, early August.
 
Apr 24, 2022     Counterinking HS Spars - (8 hours)       Category: Tail Feathers
Decided to jump ahead and perform Step 8, Pg 8-8 to countersink both HS spars, doublers and ribs. My process will have these items Alodined and epoxy primed, thus wanted to do machine work prior.


 
Mar 27, 2022     Mistakes in process of this project       Category: Mis-Steakz
Things I'm not proud of, but heck, it happens. Some cost more money i.e. VS Spar drilling error on New Years Eve with homebrew beer. Others cost time, some required call to Van's for Mod solution, some are structurally OK, but look like Hell. Proof I'm no Lindy Award builder that's for sure! (But my first hommebuild project also)


 
Mar 05, 2022     Rudder Counterweight Install - (4 hours)       Category: Tail Feathers
Had fun forming the LE for the Rudder Counterweight. After folding skins I found I was slightly off on my initial fold line. to prevent a crease I took the lead weight and carefully used a propane touch to melt the outside edges and have the molten material flow towards where the screws would soon come though skin. Allowed to slowly air cool and then tamped remaining slight high areas with ball peen hammer to final dimension counterweight. I also etch primed the overlap skins for protection. The apparent "Line" in the finished primer image is actually from a double prime, I moved the blue masking tape and thus have extra layer primer toward seam. Came out sweet! (Was able to defer page 7-10 Step #4 as there is zero "pillowing" )


 
Mar 04, 2022     Rudder Leading Edge - (12 hours)       Category: Tail Feathers
Went to Lowes for the 1 1/4" dowel for rolling the LE. Cut a small 6" piece off the roll for the smaller LE at the top of the Rudder. NOTE: If dowel diameter is too small, i.e. 1"; the leading edge radius will be too small with the edges meeting in a V, if the diameter is too large, i.e. 1 1/2" the LE radius will be too large with the edges meeting with a large gap, i.e not flush. I used a pipe wrench and vise grips which allowed me to relax and hold rolled LE skin in position as all the metal slowly stretched (solo operation). Duct tape was all I used on the skin and dowel. I also used my fingers to final shape the last 1/2" of the skins to make a nice overlap (See progression images) Be patient, learn YOUR technique. I also etch primed the skins due to the overlap both on the LE and the Rudder counterweight. Bought the "Harbor Fright" pneumatic riveter which after adding oil and practicing on scrap, worked just fine (used a rag over outlet as it sneezes oil when tilted on its side)


 
Mar 03, 2022     Rudder Trailing Edge - (10 hours)       Category: Tail Feathers
Jig set up for the pneumatic riveter and special flush rivet tool (Cleaveland Tool) set the trailing edge rivets in 4 stages of setting (light touch just enough to hold into hole, 1/32 more, 1/32 more, then final seat), initial squeeze was on the centermost rivet, then #10 left, #20 left, #10 right #20 right, then #5 L-R, #15 L-R, then marked remaining A-B-C-D. Pneumatic riveter was on a caster cart, thus able to roll left and right without disturbing position of trailing edge.


 
Dec 31, 2021     Rudder Innards Assembly - (2.0 hours)       Category: Tail Feathers
Assembled the innards for the Rudder. Pneumatic Squeezer really made things smooth and sweet! Also, took VS and Rudder skins into paint booth to Scotch-Brite inner surface and clean with M.E.K. Will touch up with SB and Acetone before acid-etch priming interior surfaces.


 
Dec 29, 2021     Assembly of Vertical Stabilizer (sans skin) - (12.0 hours)       Category: Tail Feathers
Assembled parts for Vertical Stabilizer, times included making a leveling jig for the pneumatic squeezer, countersinking a few missed holes on rear spar doubler and etch priming results. Good practice drilling out deformed rivets. Will ask Wife for assistance on riveting skins. VS all ready for skins. But will assemble Rudder next as I need to etch primer the interior surfaces of the 3 skins. (Note: While proofreading entry and images I noted a missing AN426AD4-7 rivet! Dumbass!)


 
Dec 20, 2021     Epoxy Prime Alodined Parts - (5.0 hours)       Category: Paint / Decals
Primer used over alodined components will be Sherwin-Williams CM0724933 which is a 2.8 lb/gal VOC compliant, epoxy polyamide primer. It meets MIL-PRF- 23377K, Class C2 composition and performance specification. The 2-Part primer was mixed in a ratio of 3:1 adding a slight amount of CM0110933 to make a 20-Sec #2 Zahn Cup run Primed all finished, prepped alodined parts from Vertical Stabilizer and Rudder. Left in paint booth for drying. Note: Images of pre-painted parts show variations in chromate conversion times, best time for light gold color was a mere 90-sec in tray.


 
Nov 06, 2021     Paint Booth Completed - (20 hours)       Category: Paint / Decals
Finally made time to complete my paint booth. Figure on needing it for 4+ years so I made it with some scrap materials and some very expensive lumber. 2X window fans on HIGH through filters to provide positive pressure inside booth. Used an old (+40 yrs) ignition-proof exhaust fan from Dad's old stuff. (There WILL be a filter before the exhaust fan, need to make a frame). Not a super high pressure flow, but I will be wearing a Hobby Air hooded respirator inside unit anyways.


 
Jul 30, 2021     Back from OSH Category: Misc.
OK. Officially off work for the next 6 months! First project is to finalize the paint booth design. But first a run to Washington State to pick up the 5th Wheel "Mothership II"
 
Jul 01, 2021     Still on the road Category: Tail Feathers
Still on the road working, usually off just before OSH, then we'll be back in the shop. Look for me at OSH, I'll be wearing a ball cap and sunglasses, oh, and a Hawaiian shirt
 
Apr 26, 2021     Back to Work Category: Tail Feathers
I'm back to work for a while. Won't be in the shop until further notice.
 
Feb 27, 2021     Conversion Coating - (3 hours) Category: Misc.
Darkroom trays used for conversion coating of VS and Rudder components, will make trough for long spar items. New SW Primer came today need to design and build paint booth and prime, then start assembling. Only have another week home though....
 
Feb 12, 2021     Conversion Coating - Alodine 1200S - (8.0 hours)       Category: Misc.
Designed long tanks for spar conversion coating. Using darkroom trays for smaller items. Being VERY careful using this material. Thick rubber gloves, 3M purple respirator, eye protection. No splashing, drips allowed on floor/counters. Mixed 5 gallon batch at 85F, temps drops quickly in trays, will design tray heater from heating pad and beer fridge thermo control. Used acetone to remove marks/glue etc from sample parts. Washed in Dawn dish detergent. Rinsed. DEOX B is phosphoric acid etcher, 3-min, as I used a 1:3 ratio then water rinsed. Kept in rinse water until ready to drop into Alodine tray. First sample item was waaaay too converted after 3 minutes. Finally found 1+30 optimum even with tray cooling down. Will added other samples pictures later (on road trip)


 
Feb 09, 2021     Alodine Work Area - (5 hours) Category: Misc.
Designed tables and racks for alodine conversion coating.
 
Feb 02, 2021     Rudder - (10 hours)       Category: Tail Feathers
Lots of prep for Rudder skins. Then cleco assembly to check if match drill (reaming) is needed on holes. Some parts are now final drilled from Vans so I can check sizing, inspect and debur as needed, then dry assemble for fit. Trailing edge piece is final drilled also. (Lucky-Dog!)


 
Jan 22, 2021     Rudder - (6.0 hours)       Category: Tail Feathers
Assembled bottom rib, attached rudder horn for final drilling (reaming) and MACH CSK. Built up all stiffeners and reamed #30 holes. deburred all holes, getting ready to dimple skins.


 
Jan 17, 2021     Finishing Up Vertical Stabilizer - (8.5 hours)       Category: Tail Feathers
Finished dimpling skins and spars, machine countersinking areas. Ready for conversion coating and priming. Going to jump to rudder at this time.


 
Jan 13, 2021     Vertical Stabilizer Rear Spar Day - (5 hours)       Category: Tail Feathers
Fun Day! Machine shop fun. All focus on Rear Spar, reaming, countersinking doubler, rough assemble VS sans skin.


 
Jan 12, 2021     Vertical Stabilizer - (5.5 hours)       Category: Tail Feathers
Match drilled Vertical Stabilizer rear spar and assembled for final drilling 1/8 holes tomorrow.
This build incorporates the SB-00002 Dated November 5, 2020 for the RV-10
Which changes the RV-10 bottom rudder hinge bracket. New part VS-XXXX (i'll look it up tomorrow) installed.


 
Jan 11, 2021     Rudder Stiffeners - (6.0 hours)       Category: Tail Feathers
Finished trimming, deburring and polishing up Rudder Stiffeners. Problem with a large shop is when you set down a small piece of aluminum, there are a lot of places your need to look to finally find it. Also designed tooling and jigs for new drill press and scroll saw.


 