Project: AZO-RV-8   -  
            All Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Andy Lincoln   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:271.5
Total Flight Time:
Start/Last Date:Nov 02, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=AZO-RV-8

Home or Last Project Picture

Apr 07, 2024     Meeting with Dynon - (1 hour) Category: Avionics
Had a video call with Dynon to discuss options. Received a quote with three options for review.
 
Apr 02, 2024     Landing Gear - (2.5 hours) Category: Fuselage
Reassembled gear legs. Drilled 5/16" holes for the Inboard Main Gear Attach Brackets and Inboard Wear Plates. Drilled 1/4" holes in the outer holes of the Inboard Wear Plates. Drilled out access holes in the Bottom Skin to fit wrench and socket. Drilled 1/4" holes in the outer holes of the Outboard Wear Plates.

Formed a double bend ion the gear covers to fit over the fatter aluminum landing gear.

Removed gear, cleaned all metal shavings, and deburred all holes. Flipped fuselage back over so it sits upright.
 
Mar 26, 2024     Landing Gear - (2.5 hours) Category: Fuselage
Spoke with Sky Designs. Agreed that since two independent measurements verified the same distance from the tail spring to each gear leg, and that the method of measuring toe in / toe out verified that the gear legs were parallel to the fuselage centerline, the distance between the "zees" not matching the nominal dimensions was acceptable.

Re-rigged everything to check dimensions one final time. Tightened bolt on landing gear to reduce allowance for any further movement while drilling. Drilled the 3/8" holes to secure the outboard brackets. Removed gear legs and hardware to clean up all metal shavings. Need to get 5/16" drill bit to drill final holes for the inboard brackets.
 
Mar 24, 2024     Landing Gear - (5 hours) Category: Fuselage
Aligned gear legs with multiple measurements and angles. Fabricated a SS wire measuring tape with movable locking collar to measure from tail spring bolt to bottom of landing gear legs .Also used two measuring tapes on the floor from tail to plum bobs hanging from rear of gear legs. Measured toe in / toe out. Measured distance between front and rear sides of gear legs to the forward and rear "zees". This measurement was quite far off the nominal measurement given in the Sky Designs Manual. Played around with spacing for a few hours before deciding to call Sky Designs for guidance.
 
Mar 05, 2024     Landing Gear - (0.5 hour) Category: Fuselage
Spoke with Sky Designs and got further clarity. Trimmed additional bottom skin and support channel on the aft side to accommodate outboard gear bracket with the required Van's offset of 3/16".
 
Mar 02, 2024     Landing Gear - (1.2 hours) Category: Fuselage
Trim bottom skins to accept new outboard gear leg attach brackets. Still not enough room for the brackets to be offset the correct 3/16" from the edge - will call Sky Designs for information.
 
Mar 01, 2024     Stall Warner - (1.5 hours) Category: Wings
Will not use the Van's stall warning device and instead use AOA. Drilled, dimpled, and deburred existing holes in wing leading edge for the stall warning device. Installed smaller head "oops rivets" in the two holes on the leading edge, and regular flush rivets in the remaining five holes.
 
Feb 18, 2024     Gear Legs - (1.75 hours) Category: Fuselage
Flipped fuselage upside down and gathered parts for Sky Designs gear legs. Reviewed Vans and Sky Designs directions and DWG 75. Final drilled existing holes for gear leg bolts. Fit new inboard gear leg attached brackets to gear legs. Used Scotch Brite wheel to adjust each gear leg to accept bracket. Used drill press to match drill holes in the inboard and outboard wear plates. Assembled gear legs onto fuselage using the 7/16" bolts.
 
Feb 10, 2024     Fuel Tanks - Re-attach - (2.25 hours) Category: Wings
Re-attached fuel tanks to wings. Secured all screws (all new screws used) and bolts. Torqued bolts and applied torque seal.
 
Feb 03, 2024     Fuel Tanks - Leak Test - (1.5 hours) Category: Wings
Used Van's recommended method to leak test both fuel tanks. Used supplied fittings and balloon to slightly pressurize tanks. Sprayed with water and soap solution to check for leaks and repeated test a second time on each tank. No leaks found in either tank using this method.

After performing leak test with soap solution, each tank sat for a minimum of 48 hours with the balloon inflated. The balloon did not deflate at all over this time for either tank.
 
Jan 21, 2024     Fuel Tanks - Removal - (2.5 hours) Category: Wings
Removed fuel tanks from each wing.
 
Jan 14, 2024     NACA Duct - (2.5 hours) Category: Wings
Located five holes in wing to secure NACA duct with rivets. Drilled, deburred, and dimpled holes after transferring and drilling holes in NACA duct. Created aluminum "washers" to protect plastic duct when riveting, and glued to duct. Put small bead of Pro-Seal around duct and riveted to wing.
 
Jan 13, 2024     NACA Duct - (2 hours) Category: Wings
Used SS mesh splatter guard to create screen for fresh air inlet NACA duct. Cut, formed, and glued to NACA duct. Attached hose to to NACA duct over screen and secured with supplied hose clamp. Cut, formed, and glued screens to remaining ducts for later use.
 
Dec 27, 2023     Laser Cut Parts - (4 hours)       Category: Research
This post is a collection of all LCP activities to date.

Identified all Van's orders by order number and date, including empennage, wings, fuselage, and all parts orders. Verified the following:

1. Original empennage kit did not include any LCPs.

2. Both L and R elevators were rebuilt using potential LCPs for certain components, including the following; E-703 End Rib (L&R), E-704 Counterbalance Rib (L&R), E-606PP Elevator Trim Spar (L Only), E-720H5 Elevator Stiffeners (L Only), E-709End Root Rib Right (R Only). All parts are "Replacement Recommended" by Vans except E-720H5.

3. Original wing order did not include any LCPs.

4. Original fuselage order does include LCPs. Still TBD whether any components in the QB portion itself contain LCPs. Per Vans communication, November 2, 2021 was the first date that there were "Parts Being Produced." This was before any LCPs. April 29, 2022 was "Parts in Transit to Assembly Facility." There were LCPs in inventory between these first two dates. Approximately 16 LCPs were identified existing non-built inventory. They are all identified as "Acceptable for Use."

5. The footwell outside webs, already built, show signs of cracking at several rivets. All other built assemblies, including F-830-1 Seat Floor, F-831-1 Right Seat Floor, Floor Stiffeners, and front and rear seatback assemblies were 100% inspected under 30X magnification and showed no sign of an cracks or abnormalities. All of these components were identified as "Acceptable for Use."


 
Aug 18, 2023     Flap Brace - (1.25 hours) Category: Wings
Riveted left and right wing flap braces.
 
Aug 11, 2023     Pitot and AOA Tubing - (1.5 hours) Category: Wings
Glued Click Bond holders onto wing spar.
 
Aug 10, 2023     Wiring - (1 hour) Category: Wings
Labeled all remaining wiring in the wing.
 
Aug 06, 2023     Pitot Tube - (1.75 hours) Category: Wings
Cut pitot tubing to appropriate length. Flared tubing and installed and torqued fittings.
 
Aug 05, 2023     Pitot and AOA - (3 hours) Category: Wings
Determined routing for pitot and AOA tubing an wiring. Fabricated and mounted conduit for wiring. Labeled tubing and wiring. Attached terminals where applicable.
 
Jul 16, 2023     Roll Servo and Wiring - (2.25 hours) Category: Wings
Mounted the Dynon roll servo. Torqued nuts/bolts as appropriate. Safety wired appropriate attachment bolts.

Fabricated connectors for servo wiring harness. Fabricated aluminum plate to mount to rib to secure connectors.
 
Jul 15, 2023     Wiring - (2 hours) Category: Wings
Ran wiring in wing conduit for roll servo, pitot heat, and wingtip lights.
 
Jul 14, 2023     Left Wing Lower Wing Skin - (3.5 hours) Category: Wings
Stupid Tax - remade left lower wing skin after competing the first one backwards. Drilled, reamed, and dimpled all holes. Edge finished all edges. Completed cutout for pitot mast. Attached nutplates. Primed inside of skin.
 
May 22, 2023     Seat Floors - (1.7 hours) Category: Fuselage
Completed Left and Right Foot Well Assemblies. Riveted Foot Well Assemblies to Front Seat Floor.
 
May 21, 2023     Seat Floors - (1.5 hours) Category: Fuselage
Remade Rear Seatback Hinge due to inadvertent hole. Drilled through the hinge where the keeper rivet is installed in F-830F-1. After remaking hinge, installed keeper rivet in Left Seat Floor and F-830F-1.

Back riveted nut plates to the Left and Right Seat Floors, Front Seat Floor, and Aft Baggage Floor per directions.

Riveted Floor Stiffeners and Front Seat Hinge to Front Seat Floor.
 
May 20, 2023     Seat Floors - (0.8 hour) Category: Fuselage
Back riveted Floor Stiffeners to the Left Seat Floor and Right Seat Floor. F-830C-1 Floor Stiffeners not riveted at this time per instructions.
 
May 02, 2023     Seat Floors - (2 hours) Category: Fuselage
Prepped and primed all seat floor comonents
 
May 01, 2023     Seat Floors - (1 hour) Category: Fuselage
Dimpled all required holes in Aft Baggage Floor, Front, Left, and Right Seat Floors, all Floor Stiffeners, and all Foot Well Recess components.
 
Apr 30, 2023     Seat Floors - (1.2 hours) Category: Fuselage
Took apart all seat floor components. Deburred all components and fuselage substructure.
 
Apr 22, 2023     Seat Floors - (3 hours) Category: Fuselage
Removed all floor components. Performed countersinking of holes in prep for nut plate attachment. Installed bit plates for forward bolt of Flap Bearing Blocks. Used pillars to set rivets.

Clecoed left and right seat floors together. Separated and prepped the remaining floor stiffeners and instructed. Clecoed stiffeners on place and match drilled to appropriate size. Prepped and drilled Rear Seatback Hinge. Completed prep and drilling of all floor stiffeners a instructed.

Fabricated a shim to fit under portion of Rear Seatback Hinge as instructed.
 
Apr 17, 2023     Seat Floors - (1.2 hours) Category: Fuselage
Positioned and drilled front seatback hinge.

Put together Right and Left Foot Wells and final drilled holes. Deburred all holes.
 
Apr 16, 2023     Seat Floors - (3 hours) Category: Fuselage
Trimmed and drilled Flap Bearing Blocks according to plans, Fit Flap Bearing Blocks. Match drilled holes in blocks for forward bolts. This took a long time because one of the original holes was difficult to align - the underlying flange was not bent to the correct angle making it difficult to engage the bolt.

Separated and prepared the floor stiffeners. Installed front seat floor in place to drill holes for nutplates.
 
Mar 19, 2023     Fuel Tank Closeout - (3 hours) Category: Wings
Completed the steps to close out the fuel tanks.
 
Mar 18, 2023     Seats - (4 hours)       Category: Fuselage
Riveted together front and rear seats. Was able to squeeze all rivets for front seat. Riveting the seatback was challenging as it did not want to lay flat against the side supports. Clamped and riveted as well as possible. Rear seat was also challenging. Most rivets required use of the rivet gun.


 
Mar 15, 2023     Seats - (1.25 hours) Category: Fuselage
Primed all front and rear seat components
 
Mar 14, 2023     Seats - (2.5 hours) Category: Fuselage
Fabricated hinge for rear seat (for the second time due to mistake in alignment with the first hinge). Clecoed all rear seat components together and match drilled holes. Drilled remaining holes in hinge. Deburred all hole for rear seat components. Refinished some edges as needed.

Prepped front and rear seat components for priming.
 
Mar 09, 2023     Seats - (0.5 hour) Category: Fuselage
Fabricated hinge for rear seat.
 
Mar 08, 2023     Seats - (1.5 hours) Category: Fuselage
Fabricated hinge for front seat. Clecoed all front seat components together and match drilled holes. Drilled remaining holes in hinge. Deburred all holes for front seat components. Refinished some edges as needed.
 
Mar 06, 2023     Seat Floors - (0.5 hour) Category: Fuselage
Final drilled forward mounting holes for aft control mount. Match drilled the two aft mounting holes. Drilled nut plate holes in right seat floor. Drilled the first hole for the nut plate in the left seat floor in the wrong spot. The jig moved unknowingly while drilling. After review, it would be almost impossible to use a double ear nut plate with the mis-drilled hole. Called Van's to confirm okay to use single ear nut plate. Ordered single ear nut plates and single ear nut late jigs from Aircraft Spruce.
 
Mar 05, 2023     Seat Floors - (1.5 hours) Category: Fuselage
Fit seat floors, spacers, baggage floor, and baggage shelf into place. Clecoed attach plates into position and final drilled holes. Final drilled all other holes in assembled components as required.
 
Mar 04, 2023     Seat Floors - (1.2 hours) Category: Fuselage
Prepped seat floor components. Edge finished seat floors, foot wells, webs, etc. Fabricated seat floor spacers.
 
Mar 03, 2023     Elevator Control Horns - (1.5 hours) Category: Empennage
Completed drilling of the left and right elevator control horns. Used a piece of tubing purchased from Aircraft Spruce cut to length for the bushing to act as a drill guide. Removed right elevator. Drilled left elevator horn to 3/32", removed, and step drilled to final size for bolt. Repeated steps with right elevator. Installed bolt and checked for free movement.
 
Feb 26, 2023     Fuel Tank Close Out - (3 hours)       Category: Wings
Collected parts for left and right fuel tank close outs. Bent fuel sender wires to appropriate lengths per instructions for left and right tanks. Measured resistance of each fuel sender. Each fuel sender measures in the appropriate 30-240 ohm range.

Torqued AN818-6D flare nuts to 110 in-lb. and rotated to next detent in the anti-rotation tabs. Riveted anti-rotation tabs to covers. Planned next step of securing close-out tabs and Pro-Sealing. Taped off areas where Pro-Seal will be applied.


 
Feb 25, 2023     Seat Floors - (1.5 hours) Category: Fuselage
Built wheeled jig for fuselage.

Collected all parts for seat floor. Trimmed foot wells to plans.
 
Feb 21, 2023     Seatbacks - (1 hour) Category: Fuselage
Edge finished front seatback. Edge finished all components of rear seat.
 
Feb 20, 2023     Seatbacks - (1.2 hours) Category: Fuselage
Collected parts for front and rear seats. Prepped top, bottom, and side seat supports and removed tabs from front seat back
 
Feb 18, 2023     Wing Conduit - (3 hours) Category: Wings
Created templates out of contact paper. Mixed Pro Seal (first time) and applied to each rib where the conduit passed through to help prevent the wing rib hole from penetrating the conduit over time due to vibration. Used compressed air gun to apply Pro Seal where possible. Other ribs required application by hand with tongue depressor.
 
Feb 12, 2023     Right Wing - Lower Wing Skin - (3.2 hours) Category: Wings
Drilled, deburred, dimpled, edge-finished, and primed right wing lower skin. Dimpled and riveted nut plates for access hatch. .

Drilled, deburred, and dimpled ribs and rear spar of right wing.
 
Feb 11, 2023     Left Wing - Lower Skin - (4 hours) Category: Wings
Drilled, deburred, dimpled, edge-finished, and primed left wing lower skin. Dimpled and riveted nut plates for access hatch. .

Drilled, deburred, and dimpled ribs and rear spar of left wing.
 
Feb 05, 2023     Aileron Stop - (1.5 hours) Category: Wings
Fabricated aileron stop from 5/8" Delrin rod. Inserted aileron stop in place.
 
Feb 05, 2023     AOA Inspection Plate - (1 hour) Category: Wings
Drilled, deburred, and prepped mount plate and cover. Riveted nut plates. Riveted mount plate to lower wing skin.
 
Jan 29, 2023     Wings - Pitot Tube Mount - (1.7 hours) Category: Wings
Cut out hole for pitot tube mount in bottom skin. Drilled holes in mount and skin. Riveted angle support bracket in place on rib.
 
Jan 16, 2023     Left Wing - Conduit - (1.5 hours)       Category: Wings
Drilled out the hole in the two middle ribs of the four inboard ribs to 13/16" from 3/4". Ran Van's conduit in the left wing.


 
Jan 15, 2023     Wings - Conduit - (2 hours)       Category: Wings
Ran Van's conduit in right wing. Could not get through ribs at the root. Finally drilled out the hole in the two middle ribs of the four inboard ribs to 13/16" from 3/4". This made it possible to get the conduit through the entire wing.


 
Jan 14, 2023     Wings - Conduit - (1.5 hours)       Category: Wings
Drilled 3/4" holes for conduit in ribs of left and right wing. Made template for hole in paper then in aluminum to ensure the hole was in the same spot on each rib. Used a 3/4" unibit for all holes, and a 12" extension for the inboard ribs.


 
Jan 08, 2023     Wings - Left Flap Hinge - (3 hours)       Category: Wings
Drilled hinge for the left flap. Riveted pin retainer nut plate to left flap brace. Modified hinge by removing loops from each hinge in the middle. Made two hinge pins. Assembled everything and checked for proper operation. Top of flap hits top wing skin - will need to find cause and fix.


 
Dec 30, 2022     Wings - Right Flap Hinge - (3 hours)       Category: Wings
Drilled hinge for the right flap. Riveted pin retainer nut plate to right flap brace. Modified hinge by removing loops from each hinge in the middle. Made two hinge pins. Assembled everything and checked for proper operation.


 
Dec 27, 2022     Wings - Ailerons - (2.2 hours)       Category: Wings
Attached ailerons to left and right wings. Assembled W-818 pushrods to ailerons and bellcrank. Fabricated fixture from wood to align the aileron and flap. Once aligned, used W-730 bellcrank jig to preliminarily set length of W-818 pushrod assembly.


 
Dec 20, 2022     Wings - W-818 Pushrod - (0.5 hour) Category: Wings
Reamed inside of W-818 pushrod tube to fit threaded rod ends. Took W-818 pushrods to local welder to weld rather than rivet. After pickup, primed and painted outside of pushrods.
 
Dec 18, 2022     Aileron Pushrods W-816 - (3 hours) Category: Wings
Primed outside of W-818 aileron pushrods. Assembled threaded rod ends and threaded rod end bearings to appropriate length.

Made bushing for bellcrank brackets. Installed W-818 aileron pushrods in bellcrank brackets.
 
Dec 17, 2022     Aileron Pushrods - (1.5 hours) Category: Wings
Cut aileron pushrods to length from AT6-035X1.125. Primed inside of aileron pushrods W-816 and W-818 pushrods.
 
Nov 25, 2022     Fuselage - Inventory - (1.5 hours) Category: Fuselage
Inventoried fuselage kit.
 
Nov 25, 2022     Aileron Brackets - (1 hour) Category: Wings
Installed inboard and outboard aileron brackets on the left and right ailerons.
 
Nov 17, 2022     Aileron Bellcranks - (2 hours) Category: Wings
Removed aileron bellcrank brackets from each wing. Installed Sky Designs Ball Bearing Bellcrank hardware following the Sky Designs kit instructions.
 
Oct 18, 2022     Flap Braces - (1.5 hours) Category: Wings
Realized I riveted the flap braces to the underside of the wing, without including the flap hinge. Drilled out all of the rivets connecting the flap braces to the wings.
 
Oct 15, 2022     Aileron Gap Fairings and Flap Braces - (2 hours) Category: Wings
Riveted aileron gap fairings and flap braces to left and right wings.
 
Oct 14, 2022     Aileron Gap Fairings and Flap Braces - (1.2 hours) Category: Wings
Edge finished, deburred, and primed aileron gap fairings and flaps braces.
 
Oct 08, 2022     Aileron Brackets - (1.5 hours) Category: Wings
Riveted Aileron Brackets to rear spar. Incorporated SB-16-02-28 components as part of the assembly. Riveted using a combination of hand squeezer and rivet gun.
 
Oct 05, 2022     Aileron Brackets - (1.2 hours) Category: Wings
Riveted aileron brackets together.
 
Oct 04, 2022     Aileron Brackets - (0.8 hour) Category: Wings
Drilled, deburred, countersunk, and primed aileron brackets.
 
Sep 16, 2022     Aileron Gap Fairings and Flap Braces - (1 hour) Category: Wings
One rivet in quickbuild wings installed in wrong location on spar, Drilled out rivet and installed in correct location.

Trimmed flap braces. Clecoed flap braces and aileron gap fairing to wings.
 
Sep 02, 2022     Trim Tab - (3 hours) Category: Empennage
Match drilled trim tab hinge and trim tab skin and spar. Finished edges of trim tab hinge and rounded outboard edges.

Match drilled trim tab hinge and elevator skin and trim spar. Finished inboard edge of trim tab hinge.

Riveted top of trim tab. Set blind rivets on trim tab ends. Riveted trim tab hinge to elevator. Installed pin.
 
Aug 22, 2022     Trim Tab - (1 hour) Category: Empennage
Trimmed trim tab horn. Riveted bottom of trim tab skin to spar and trim tab horns with longeron yoke.
 
Aug 21, 2022     Trim Tab - (2.2 hours) Category: Empennage
Finished edges of trim tab components and primed skin and spar.

Fabricated new bending blocks and bent inboard and outboard tabs.

Match drilled trim horns and trim tab skin. Clamped trim tab hinge in place
 
Aug 16, 2022     Left Elevator - Roll and Rivet Leading Edge - (1.2 hours) Category: Empennage
Rolled and riveted the left elevator leading edge.
 
Aug 15, 2022     Left Elevator - Riveting - (1.2 hours) Category: Empennage
Added sealant to trailing edge of left elevator skin. Finished riveting the left elevator with the elevator skin and rear spar.

Completed install of the counterweight.
 
Aug 14, 2022     Left Elevator - Riveting - (3 hours) Category: Empennage
Back riveted stiffeners to left elevator skin. Back riveted trim servo support bracket to left elevator skin. Bent trailing edge of left elevator.

Riveted the elevator skeleton components together
 
Aug 13, 2022     Left Elevator - Priming - (1.5 hours) Category: Empennage
Primed all left elevator components.
 
Aug 12, 2022     Left Elevator - Dimpling - (1.2 hours) Category: Empennage
Dimpled all left elevator components.
 
Aug 08, 2022     Left Elevator - Drilling and Deburring - (1.7 hours) Category: Empennage
Clecoed together all left elevator components. Drilled all holes out to size. Deburred all holes.
 
Aug 03, 2022     Left Elevator - Edge Finishing - (1.5 hours) Category: Empennage
Performed edge finishing of skin and all components.
 
Jul 31, 2022     Left Elevator - Stiffeners - (1 hour) Category: Empennage
Unwrapped components. Cut and shaped left elevator stiffeners.
 
Jul 05, 2022     Left Elevator - Ordered New Parts - (0.5 hour) Category: Empennage
Building new left elevator due to leading edge. Ordered new components to build new left elevator.
 
Jul 02, 2022     Right Elevator - Leading Edge - (1.5 hours) Category: Empennage
Rolled and riveted right elevator leading edge. Installed rod end bearings.
 
Jul 01, 2022     Right Elevator - Riveting - (1.5 hours) Category: Empennage
Riveted counterbalance skin and skin to understructure. Attached counterweight.
 
Jun 28, 2022     Right Elevator - Riveting - (0.5 hour) Category: Empennage
Riveted end ribs, reinforcement plates, root rib, and elevator horn.
 
Jun 27, 2022     Right Elevator - Stiffeners - (1 hour) Category: Empennage
Back riveted stiffeners to right elevator skin. Bent trailing edge of right elevator skin.
 
Jun 26, 2022     Right Elevator - Stiffeners and Prep Elevator - (3 hours) Category: Empennage
Match drilled stiffeners and right elevator skin. Match drilled understructure components and skin. Deburred, dimpled, edge finished, and primed all components.
 
Jun 19, 2022     Right Elevator - Stiffeners - (1.5 hours) Category: Empennage
Cut, formed, and edge finished stiffeners for right elevator.
 
May 20, 2022     Wings - Inventory - (1.5 hours) Category: Wings
 
Mar 28, 2022     Right Elevator - Ordered New Parts - (0.5 hour) Category: Empennage
Building new right elevator due to leading edge. Ordered new components to build new right elevator.
 
Mar 20, 2022     Left Elevator - Leading Edge - (2 hours) Category: Empennage
Rolled and riveted left elevator leading edge.
 
Mar 19, 2022     Left Elevator - (1 hour) Category: Empennage
Dimpled tabs on left elevator and riveted with CCC-42 rivets.

Applied RTV and riveted top skin of left elevator.
 
Feb 21, 2022     Left Elevator - (1 hour) Category: Empennage
Drilled out all rivets attaching top elevator skin to spar components for two reason:

1. Forgot to put RTV along the trailing edge of the stiffeners.
2. Did not drill and dimple holes for the bent elevator tabs (elected to use flush rivets).
 
Feb 20, 2022     Left Elevator - (2.5 hours) Category: Empennage
completed riveting left elevator spar structure and completed riveting of left elevator skin to the spar.
 
Feb 19, 2022     Left Elevator - (1 hour) Category: Empennage
Bent tabs together to close the left elevator near the trim tab.
 
Feb 18, 2022     Left Elevator - (3 hours) Category: Empennage
Prepped and primed trim tab. Riveted tabs to trim plate.
Riveted left elevator spar components together.
Fabricated wooden blocks to bend elevator skin tabs and bent tabs.
 
Feb 14, 2022     Left Elevator - (1.5 hours) Category: Empennage
Primed remaining left elevator components. Riveted nut plates onto trim access reinforcing plate and riveted plate onto left elevator skin. Bent trailing edge of left elevator.
 
Feb 13, 2022     Left Elevator - (2 hours) Category: Empennage
Studied the plans and directions for the trim access plate and mounting components. Prepped and primed trim access plate.

Riveted stiffeners to left elevator skin.
 
Feb 11, 2022     Left Elevator - (0.5 hour) Category: Empennage
Primed left elevator skin and stiffeners.
 