EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Bear5
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (125)
Research
- (1)
Workshop
- (6)
Empennage
- (12)
Fuselage
- (34)
Firewall
- (1)
Tail Feathers
Wings
- (13)
Controls
- (27)
Avionics
Lighting
Instrument Panel
- (1)
Landing Gear
- (16)
Engine
- (3)
Propeller
- (1)
Fuel System
- (9)
Interior Finish
Paint / Decals
- (1)
Inspection
Tools
Builder Name:
Ryan Barker
-
Project:
Bearhawk - Other
-
VIEW REPORTS
Total Hours:
789.7
Total Flight Time:
Start/Last Date:
Dec 16, 2020 - No Finish Date
Engine:
Lycoming IO540
Propeller:
Hartzell Trailblazer
Friendly URL:
https://eaabuilderslog.org?s=Bear5
Home or Last Project Picture
May 13, 2024
Painting wings
Category: Wings
IMG_1160.jpeg
IMG_1162.jpeg
May 13, 2024
Mount wings
Category: Wings
IMG_1123.jpeg
IMG_1125.jpeg
IMG_1126.jpeg
IMG_1129.jpeg
May 13, 2024
Wing tip prep
Category: Wings
IMG_1055.jpeg
Apr 25, 2024
Painting the doors, window frames, etc
Category: Fuselage
IMG_0986.jpeg
Apr 25, 2024
Final riveting of bottom skins
Category: Wings
IMG_0963.jpeg
IMG_1010.jpeg
Apr 03, 2024
Auxiliary tank installation, wiring, pitot tube
- (90 hours)
Category: Wings
IMG_0618.jpeg
IMG_0684.jpeg
IMG_0683.jpeg
IMG_0762.jpeg
IMG_0766.jpeg
IMG_0774.jpeg
IMG_0773.jpeg
Mar 11, 2024
Attach ailerons to line up wingtips
- (4 hours)
Category: Controls
Wingtips need to be bonded at aft end and cut to length as well as locate wingtip lights on outermost arch of tip. Check alignment and motion of ailerons.
IMG_0513.jpeg
IMG_0512.jpeg
IMG_0511.jpeg
IMG_0507.jpeg
Mar 01, 2024
Double checking flight control fit/reach
- (.5 hour)
Category: Controls
Last qc of flight control (stick and rudder pedals) placement and seat movement/adjustment.
IMG_0296.jpeg
IMG_7796.jpeg
IMG_7793.jpeg
IMG_7794.jpeg
Mar 01, 2024
Fuel tanks/Aux tanks
- (10 hours)
Category: Wings
Drilled holes for fuel lines and fittings for both main and aux tanks as well as fabricated aux tank straps and drilled aux tank filler neck hole. Placed grommets and ran fuel line on right wing. Left wing fuel line and aux tank transfer pump mounting next.
IMG_7822.jpeg
IMG_7821.jpeg
IMG_7818.jpeg
IMG_7817.jpeg
IMG_7816.jpeg
IMG_7813.jpeg
IMG_7812.jpeg
IMG_7811.jpeg
IMG_7810.jpeg
IMG_7792.jpeg
IMG_7791.jpeg
IMG_7790.jpeg
Mar 01, 2024
Initial paint
- (40 hours)
Category: Paint / Decals
Fuselage and flight controls painted. More to go on fuselage when wings are ready (in a few weeks).
IMG_0027.jpeg
IMG_0022.jpeg
IMG_0023.jpeg
IMG_0025.jpeg
IMG_9515.jpeg
IMG_9516.jpeg
IMG_9526.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.