Project:
Bear5
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (122)
Research
- (1)
Workshop
- (6)
Empennage
- (12)
Fuselage
- (34)
Firewall
- (1)
Tail Feathers
Wings
- (10)
Controls
- (27)
Avionics
Lighting
Instrument Panel
- (1)
Landing Gear
- (16)
Engine
- (3)
Propeller
- (1)
Fuel System
- (9)
Interior Finish
Paint / Decals
- (1)
Inspection
Tools
Builder Name:
Ryan Barker
-
Project:
Bearhawk - Other
-
VIEW REPORTS
Total Hours:
789.7
Total Flight Time:
Start/Last Date:
Dec 16, 2020 - No Finish Date
Engine:
Lycoming IO540
Propeller:
Hartzell Trailblazer
Friendly URL:
https://eaabuilderslog.org?s=Bear5
Home or Last Project Picture
Apr 25, 2024
Painting the doors, window frames, etc
Category: Fuselage
IMG_0986.jpeg
Apr 25, 2024
Final riveting of bottom skins
Category: Wings
IMG_0963.jpeg
IMG_1010.jpeg
Apr 03, 2024
Auxiliary tank installation, wiring, pitot tube
- (90 hours)
Category: Wings
IMG_0618.jpeg
IMG_0684.jpeg
IMG_0683.jpeg
IMG_0762.jpeg
IMG_0766.jpeg
IMG_0774.jpeg
IMG_0773.jpeg
Mar 11, 2024
Attach ailerons to line up wingtips
- (4 hours)
Category: Controls
Wingtips need to be bonded at aft end and cut to length as well as locate wingtip lights on outermost arch of tip. Check alignment and motion of ailerons.
IMG_0513.jpeg
IMG_0512.jpeg
IMG_0511.jpeg
IMG_0507.jpeg
Mar 01, 2024
Double checking flight control fit/reach
- (.5 hour)
Category: Controls
Last qc of flight control (stick and rudder pedals) placement and seat movement/adjustment.
IMG_0296.jpeg
IMG_7796.jpeg
IMG_7793.jpeg
IMG_7794.jpeg
Mar 01, 2024
Fuel tanks/Aux tanks
- (10 hours)
Category: Wings
Drilled holes for fuel lines and fittings for both main and aux tanks as well as fabricated aux tank straps and drilled aux tank filler neck hole. Placed grommets and ran fuel line on right wing. Left wing fuel line and aux tank transfer pump mounting next.
IMG_7822.jpeg
IMG_7821.jpeg
IMG_7818.jpeg
IMG_7817.jpeg
IMG_7816.jpeg
IMG_7813.jpeg
IMG_7812.jpeg
IMG_7811.jpeg
IMG_7810.jpeg
IMG_7792.jpeg
IMG_7791.jpeg
IMG_7790.jpeg
Mar 01, 2024
Initial paint
- (40 hours)
Category: Paint / Decals
Fuselage and flight controls painted. More to go on fuselage when wings are ready (in a few weeks).
IMG_0027.jpeg
IMG_0022.jpeg
IMG_0023.jpeg
IMG_0025.jpeg
IMG_9515.jpeg
IMG_9516.jpeg
IMG_9526.jpeg
Jan 13, 2024
Repeat covering process for control surfaces
- (80 hours)
Category: Wings
Repeat covering process for control surfaces
IMG_9340.jpeg
IMG_9418.jpeg
IMG_9411.jpeg
IMG_9421.jpeg
IMG_9441.jpeg
IMG_9442.jpeg
IMG_9440.jpeg
IMG_9453.jpeg
IMG_9460.jpeg
IMG_9483.jpeg
Jan 13, 2024
Sanding between each of the 3 cross coats of Ekofil
Category: Fuselage
Sanding between each of the 3 cross coats of Ekofil
IMG_9328.jpeg
IMG_9351.jpeg
IMG_9349.jpeg
IMG_9363.jpeg
IMG_9362.jpeg
Dec 16, 2023
3-1 diluted Ekobond and Ekofill
Category: Fuselage
IMG_9318.jpeg
IMG_9319.jpeg
IMG_9326.jpeg
IMG_9327.jpeg