EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
GambinoRV10
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (5)
Research
Workshop
- (1)
Empennage
- (4)
Fuselage
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Albert Gambino
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
8
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Jan 08, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=GambinoRV10
Home or Last Project Picture
Jul 19, 2021
Vertical Stabilizer
- (2 hours)
Category: Empennage
Deburred skeleton parts for the vertical stabilizer. Assembled the vertical stabilizer skeleton. Match drilled components together. Attached the skin to the vertical stabilizer with clecos.
IMG_8015 2.jpg
Jul 18, 2021
Vertical Stabilizer Spar
- (2 hours)
Category: Empennage
Spar doubler deburred, match drilled, countersunk, and cleco'd to the spar and spar cap along with the rudder hinge brackets
Vert Stabilizer spar with doubler.jpg
Jul 15, 2021
Vertical Stabilizer Spar
- (2 hours)
Category: Empennage
Left and right rear spar caps cut, deburred, match drilled with spar.
Vert Stabilzer Spar with spar caps.jpg
Jul 12, 2021
Workshop
Category: Workshop
Workspace.jpg
Jan 05, 2021
Crate Delivery
- (2 hours)
Category: Empennage
Crate Received and parts all inventoried. Back ordered parts received and deficiencies addressed. All part have since been received.
Empennage Crate.jpg
Empennage Crate 2.jpg
Empennage Crate 3.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.