Project: emoak   -  
            All Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Eric Moak   -  
Project:   Bearhawk - 4 Place   -   VIEW REPORTS
Total Hours:284.5
Total Flight Time:
Start/Last Date:Feb 06, 2021 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=emoak

Home or Last Project Picture

Apr 15, 2022     Cap strips - (12 hours) Category: Wings
Cut main spar capstrips to length. Laid out capstrips and marked drill locations. Started drilling capstrips. Pictures coming soon
 
Feb 05, 2022     Assembly table - (12 hours) Category: Workshop
Built a matching flat 3'x8' assembly table and shimmed up tables to be super flat for spar build up
 
Feb 05, 2022     Spar plates templates - (15 hours)       Category: Wings
Built templates to cut out all the spar plates. Also laid out and drilled rivet hole locations


 
Dec 20, 2021     Spars - (12 hours)       Category: Wings
Rough cut and finished cut all the blanks for the wing spars. Fronts, rears, flaps, and ailerons. Had shop in Spokane do the bending.


 
Dec 02, 2021     Rib attach angles - (20 hours)       Category: Wings
Built all the rib attach angles. Cut 1 inch strips, broke to 90 degs, and drilled mount holes one side.


 
Oct 17, 2021     .032 center ribs, false spar ribs and wing tip ribs - (16 hours)       Category: Wings
Rough cut and finished cut 8 .032 center ribs, 4 false spar ribs, and 2 .025 wing tip ribs. Flanged and straightened wing tip ribs, false spar ribs and 4 of the .032 center ribs


 
Sep 11, 2021     Etch, prime, and add rib stiffeners - (30 hours)       Category: Wings
Acid etched, and primed nose ribs, .025 center ribs, and rib stiffener angles. Added rib stiffeners to nose ribs and .025 center ribs


 
Aug 14, 2021     Rib stiffeners - (20 hours)       Category: Wings
Cut 1 inch strips, cut to length, bent into 1/2x1/2 angle, and drilled holes using homemade jig


 
May 22, 2021     Flap nose ribs, Aileron nose and pocket ribs - (8 hours)       Category: Wings
Fabricated cutting jigs and forming jigs for fabricating the flap nose ribs, aileron nose ribs, and aileron pocket ribs


 
May 02, 2021     Center ribs, rear ribs, flap ribs - (25 hours)       Category: Wings
Finished up forming and flanging lightening holes on all the .025 center ribs. Rough cut, finish cut, formed and flanged all the rear ribs. Rough cut, finish cut, and started forming flap ribs.


 
Apr 07, 2021     Center ribs - (7 hours)       Category: Wings
Finished forming the .025 left wing center ribs. Made a lightening hole forming jig for the center ribs and formed the lightening holes in the left center ribs.


 
Apr 02, 2021     Center ribs - (2 hours) Category: Wings
Formed a few center ribs
 
Apr 01, 2021     Center ribs - (3.5 hours) Category: Wings
Rough cut the rest of the .025 center ribs and the four back ribs. Finish cut the 14 .025 center ribs
 
Mar 31, 2021     Center ribs - (2 hours)       Category: Wings
Started rough cutting out center ribs, cut out 6. Finished cut a few to test out jigs. All checked out good.


 
Mar 30, 2021     Nose ribs - (2.5 hours)       Category: Wings
I miscounted nose ribs when I originally cut them out and came up 3 short. Rough cut, finish cut, formed, and flanged the last 3 left nose ribs.


 
Mar 28, 2021     Nose ribs - (6 hours) Category: Wings
Finished the 23 right side nose ribs. Formed and flanged 20 left side nose ribs.
 
Mar 27, 2021     Nose ribs - (6 hours)       Category: Wings
Built a jig to hydroform flanges on lightening holes. Still testing with the press set-up and have room for improvement but the flange is turning out way better than my attempt using the bob stick method. Have formed and flanged lightening holes on about 18 ribs.


 
Mar 27, 2021     Nose ribs - (2 hours)       Category: Wings
Finished up finish cutting and de-burring all 46 nose ribs plus about 4 extras


 
Mar 24, 2021     Nose ribs - (2 hours) Category: Wings
Worked on finish cutting nose ribs
 
Mar 23, 2021     Nose ribs - (2.5 hours) Category: Wings
Finished rough cutting nose ribs.
 
Mar 22, 2021     Nose ribs - (3 hours)       Category: Wings
Rough cutting and finish cutting more nose ribs. Experimented with hole flanging using the bob stick method. Not super happy with results. Going to try hydroforming them later this week.


 
Mar 21, 2021     Nose ribs - (6 hours)       Category: Wings
Rough cut about 20 nose ribs. Cut approximately 15 on the router with cutting jig. Deburred 5 of them. Flanged and fluted the 5 deburred ribs.


 
Mar 06, 2021     Built workbench - (12 hours) Category: Workshop
Built a very flat 3' x 8' assembly table with lower shelf
 
Feb 27, 2021     Rib cutting and forming blocks - (6 hours)       Category: Wings
Continued to manufacture cutting and forming blocks


 
Feb 17, 2021     Rib cutting and forming blocks - (6 hours)       Category: Wings
Cut out mylar template and starting making the form blocks and routing guides for the wing ribs


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.