Project: BeaverSTOL   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:David Larson   -  
Project:   Zenith - CH 750 STOL   -   VIEW REPORTS
Total Hours:164
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jan 28, 2021 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=BeaverSTOL

Home or Last Project Picture

Dec 31, 2022     Firewall construction - (8 hours)       Category: Firewall
Dry assembled firewall front and back. Cut L angle and drilled per plans. Opened all holes to final size. Disassembled and de-burred all holes and edges. Powder coated aluminum parts on the front side white. Reassembled and riveted. AN-3 bolts, washers, and lock nuts installed on upper nose gear assembly. Green nylon bushing and hardware installed.


 
Oct 02, 2022     Empennage - (40 hours)       Category: Empennage
August 18 Fuselage, Empennage, Wings, and finishing kit arrived. Spent two days (8 hours total) confirming inventory and organizing parts. Followed pictorial guide, plans, and home built help videos. Dry fit pieces. Opened holes to final size per plans. Disassembled. Deburred and coated mating surfaces with Cortek for anti corrosion protection. Reassembled and riveted.


 
Dec 26, 2021     Flaperons - (7 hours)       Category: Wings
Completed second set (inboard and outboard pilot side) flaperons. Same process as the first set. Jake and Eric were a lot of help.


 
Dec 22, 2021     Flaperons - (8 hours)       Category: Wings
Drilled and deburred where needed. Assembled passenger side inboard and outboard flaperons. Primed mating surfaces and riveted A4 and A5 rivets per the plans. Much quicker assembly than the tail section. These are updated parts and mostly all holes were already final sized. Long but fun day.


 