Getting my last spar tack riveted together. Getting the first 40-50 rivets in takes a lot of time because I'm moving up and down the spar where there are different material thicknesses. That means reseting the squeezer and cutting different rivet lengths. Things go faster after all the different material thicknesses have some rivets installed and the spar gains some stiffness and strength. So tomorrow I hope to get 20-30 rivets in. More every day after that. Will be really glad when these spars are complete, it's been a long road but very satisfying.