Total Hours:337.5
Total Flight Time:
Start/Last Date:Mar 19, 2021 - No Finish Date
Engine:Corvair
 
Friendly URL: https://eaabuilderslog.org?s=DHabit

Home or Last Project Picture

Jan 19, 2024     Aft Bulkheads and Top Skin - (08 hours)       Category: Fuselage
Set Horizontal stabilizer; drilled 4 attachment brackets 6B1-8&9. Set bulkheads 6B12-1, 2, and 3. Drilled pilot holes for each bulkhead. Set angle for each bulkhead to 84 degrees. Set rear top skin 6B21-6; drilled and clecoed to bulkheads.


 
Jan 11, 2024     Factory Support - (.5 hour) Category: Research
Called Roger at Zenith for clarification on elevation of aileron control tube.
 
Jan 11, 2024     Cabin and Rear Bulkheads - (3.5 hours) Category: Fuselage
Layout and positioning for rear bulkheads 6B12-1, 2 and 3. Drilled rear frame channel 6B5-2; de-burred and primed. Fabricated and installed rudder fairleads on rear channel frame. Drilled hole for lower elevator fairlead in seat back upright.
 
Feb 22, 2023     RW Spar Reinforcement Angle - (5 hours)       Category: Wings
Drilled and primed replacement spar extrusion angle and spar top cap angle.


 
Feb 21, 2023     RW Flap Hinge - (3 hours) Category: Wings
Drilled flap hinge connection to rear channel. Positioned aileron and cut opening in rear channel for aileron counter balance arm. Drilled and riveted wing tie-down ring at rear rib #9.
 
Feb 20, 2023     RW Aileron Bell Crank Reinforcing - (2 hours)       Category: Wings
Cut and drilled aileron bell crank reinforcing angles per upgrade drawing. Riveted lower two to bottom skin.


 
Feb 10, 2023     RW Aileron Bellcrank - (2 hours)       Category: Wings
Fabricated replacement aileron bellcrank per upgrade drawing-metal thickness changed from .025 to ,040, enlarged flanges from 20mm to 40mm.


 
Feb 09, 2023     RW Wing Tip Spar - (3 hours)       Category: Wings
Fabricated and drilled new wingtip spar from stock metal.


 
Feb 03, 2023     RW Locker Lightening Hole Cover Plates - (1.5 hours) Category: Wings
Installed nut plates for wing locker lightening hole cover plates.
 
Feb 02, 2023     RW Lightening Hole Covers - (1.5 hours)       Category: Wings
Fabricated cover plates for the wing lightening holes from stock sheet.


 
Feb 02, 2023     RW Nav Lights - (1.5 hours)       Category: Lighting
Drilled rear ribs and installed power feed for Navigation lights and optional future landing light in right wing.


 
Feb 01, 2023     RW Top Skin - (2.5 hours)       Category: Wings
Cut and drilled replacement top skin from 4' x12' sheet.


 
Jan 31, 2023     RW Fuel Tank Completion - (4 hours)       Category: Wings
Verified Ohm readings for fuel sender at full and empty positions. Installed ground wire lead for fuel tank. Located and drilled leading edge top skin for fuel filler cap. Placed fuel tank in wing and verified placement.


 
Jan 30, 2023     RW Leading Edge Skin Top - (6 hours)       Category: Wings
Fabricated templates to transfer existing nose rib holes to new leading edge skin-drilled new skin. Installed fuel sender unit in tank and applied cork protection to perimeter. Drilled leading edge skin for fuel vent and quick drain pipes.


 
Jan 29, 2023     RW Leading Edge Skin - (2 hours)       Category: Wings
Drilled spar line for leading edge skin. Layout and pilot holes for fiberglass wingtip.


 
Jan 27, 2023     RW Leading Edge Skin, Aileron - (7 hours)       Category: Wings
Completed nut plate installation for fingerscreen access cover. Drilled, primed and installed piano hinge option for aileron. De-burred and primed inside of leading edge skin. Riveted bottom side of leading edge skin. Completed piano hinge installation on Aileron.


 
Jan 26, 2023     Right Wing Leading Edge Skin - (7 hours)       Category: Wings
Set new leading edge skin bottom-drilled spar line, nose ribs and clecoed. Fabricated fingerscreen access cover plate; drilled and prepped for nut plates. Installed nut plates on aileron access cover plate and set in place.


 
Jan 25, 2023     RW Leading Edge Skin - (2 hours)       Category: Wings
Flipped right wing over and started installation of new leading edge skin.


 
Jan 23, 2023     RW Flap - (3 hours)       Category: Wings
Fabricated template to transfer hole locations to new flap piano hinge. Drilled, de-burred and primed hinge. Riveted hinge to flap.


 
Jan 22, 2023     RW Aileron/Flap - (3.5 hours)       Category: Wings
Started modification to aileron to replace flexible metal connection to wing with piano hinge option. Removed existing hinge from flap to correct layout issue.


 
Jan 04, 2023     LW-End Panel - (5 hours)       Category: Wings
Fabricated, drilled and de-burred LW end panel. Positioned fiberglass wing tip along with templated for navigation lights.


 
Dec 13, 2022     LW-Storage Locker - (4 hours) Category: Wings
Fabricated replacement cover for wing storage locker. Drilled holes for DZUS fasteners. Completed remaining rivets on top skin.
 
Dec 12, 2022     LW Skin Riveting - (1 hour)       Category: Wings
Riveted top skin to main spar and wing ribs.


 
Dec 11, 2022     LW Top Skin Riveting - (2 hours) Category: Wings
Riveting on top skin to rear channel and wing ribs.
 
Dec 09, 2022     LW Fingerscreen Access Panel - (1 hour) Category: Wings
Installed nut plates on finger screen access cover.
 
Dec 07, 2022     LW Leading Edge Skin - (1.5 hours)       Category: Wings
Set fuel tank. Pulled leading edge skin tight and clecoed along with top skin.


 
Dec 06, 2022     LW Storage Locker - (5 hours) Category: Wings
Completed nut plates for lightening holes cover plates. Drilled, primed and clecoed DZUS strips at wing locker lid. Riveted angles supports for aileron bellcrank in top skin. Drilled finger screen access plate and modified size to fit.
 
Dec 02, 2022     LW Storage Locker - (2 hours)       Category: Wings
Fabricated cover plates for lightening holes in wing locker; installed nut plates on outboard cover.


 
Dec 01, 2022     LW-Storage Locker - (3 hours)       Category: Wings
Installed angles to support rear wall of storage locker. Drilled DZUS strips for lid support. Installed angles to support Pitot tube.


 
Nov 09, 2022     LW Pitot and Storage Locker - (6 hours)       Category: Wings
LW-Installed aileron control arm. Installed Pitot tube and hose to wing root end. Cut opening in top skin for storage locker-riveted rear wall of wing storage locker, Fabricated and riveted angles on bottom side of locker lid.


 
Oct 16, 2022     LW Aileron Installation - (4.0 hours)       Category: Wings
Installed piano hinge option for left wing aileron. Tested trim servo and installed control cable. Leveled main spar and rear channel-set spar to 81 degrees. Primed and installed aileron balance arm weights per upgrade drawing.


 
Sep 22, 2022     LW Fuel Tank - (2.5 hours)       Category: Wings
Grounded fuel tank and fuel sender to airframe; applied cork strips to top of tank. Riveted #4 rear rib to main spar.


 
Jul 05, 2022     Left Wing Skin - (7 hours)       Category: Wings
Fabricated new left wing bottom skin from stock 4 x 12 sheet; drilled, deburred and primed underside. Riveted skin to rear ribs.


 
Mar 13, 2021     RW Upgrade - (2 hours) Category: Wings
Assembled nose ribs angles 1 to 3. Bolted root doubler and torqued bolts to 25 inch/lbs.
 
Mar 12, 2021     RW Upgrade - (3 hours) Category: Wings
Continued installed of 6ZU1-2, 3 and 4. Drilled and primed backs along with spar doubler. Fabricated some standard angles from stock.
 
Mar 11, 2021     RW Work - (2 hours) Category: Wings
Started upgrade on right wing. Drilled root doubler 6ZU1-2. Started nose ribs angles for #1 to #3 with upgrade parts 6ZU1-3 and 6ZU1-4.
 
Jul 21, 2020     Relocated Category: Proj. Delay
Project transported to NC and placed into storage.
 
Apr 01, 2020     To Storage Category: Proj. Delay
Moved project into temporary storage.
 
Sep 01, 2019     Dissasembly Category: Proj. Delay
Started project disassembly in preparation for cross country move.
 
Jul 28, 2019     Cabin Work - (2 hours) Category: Fuselage
Fabricated and installed seat back channel 6B16-3 on co-pilot sice. Drilled and clecoed middle bulkhead.
 
Aug 26, 2018     Rear Fuselage - (4 hours) Category: Fuselage
Installed cable fairlead. Primed and riveted angle for middle bulkhead. Installed angles from seat back to bulkhead. Installed 45 degree stiffener. Installed rolled gusset.
 
Aug 14, 2018     Cabin Work - (3 hours) Category: Fuselage
Installed support channel 6K2-1. Drilled out firewall stiffener to attach angle for 6K2-1. Adjusted location of instrument panel.
 
Jun 17, 2018     Cabin Work - (4 hours) Category: Fuselage
Installed right side front ribs. Installed right side gear uprights 6B11-3. Installed doubler 6B14-1. Drilled side doubler 6ZU3-2.
 
May 19, 2018     Cabin Work - (1.5 hours) Category: Fuselage
Re-ser forward side skin. Installed upright doubler 6ZU3-5. Cut hole for rear channel attachment plate 6ZU3-3.
 
Apr 21, 2018     Cabin Work - (4 hours) Category: Fuselage
Re-installed front wing uprights left side. Re-installed upright doubler 6ZU3-5. Re-installed landing gear uprights. Re-installed side doubler and drilled front side.
 
Nov 29, 2017     Cabin Work - (3 hours) Category: Fuselage
Installed shoulder harness fittings 6B21-3 and fabricated gusset 6B21-4.
 
Nov 24, 2017     Cabin Work - (8 hours) Category: Fuselage
Installed angles for baggage support-made template for baggage floor. Cut baggage floor to size and set in position. Installed landing gear attachments on both sides. Cut out for center spar and landing gear in forward side skins.
 
Nov 22, 2017     Cabin Work - (3 hours) Category: Fuselage
Installed center spar uprights 6B13-2 and 6ZU-6. Installed gusset 6B10-4 and doubler 6ZU3-2.
 
Nov 21, 2017     Cabin Work - (5 hours) Category: Fuselage
Drilled fuselage forward skin and side skins to size. Installed baggage floor support angles at side skins. Installed seat back side channel 6B16-3.
 
Nov 20, 2017     Cabin Work - (7 hours) Category: Fuselage
Installed center spar uprights. Installed 6ZU3-2 fuselage side doubler. Installed angles at forward fuselage sides. Installed upright doubler 6ZU3-5.
 
Nov 08, 2017     Cabin Side Skin - (5 hours) Category: Fuselage
Disassembled front fuselage; releveled cabin floor, Confirmed angle of firewall, center spar and seat back. Fabricated new cabin side skin pilot side.
 
Oct 13, 2017     Center Spar - (5 hours) Category: Fuselage
Installed winged jigs with #1 rib as guide. Installed center spar uprights left side. Installed channel upright on left side.
 
Oct 12, 2017     Cabin Work - (1 hour) Category: Fuselage
Fabricated left and right channel uprights 6B5-6.
 
Sep 02, 2017     Pilot Wing Jig - (2 hours) Category: Fuselage
Constructed wing jig for pilot side.
 
Sep 01, 2017     Cabin Work - (3 hours) Category: Fuselage
Installed upper engine mounts 6B6-4. Replaced lower engine mounts 6B6-5. Reinstalled left side skin and main gear uprights 6B11-3. Fabricated angles for side skin at heel support 6B8-8.
 
Aug 28, 2017     Cabin Work - (1.5 hours) Category: Fuselage
Replaced firewall bottom stiffener 6B6-1. Prepped cabin floor longeron for installation (cut and sanded).
 
Aug 27, 2017     Brake Supports - (1 hour) Category: Fuselage
Prepped, primed and riveted brake supports to cabin floor.
 
Aug 20, 2017     Cabin Floor - (4 hours) Category: Fuselage
De-burred cabin floor and primed. Installed channel doubler. Installed main gear attachment co-pilot side. Installed rudder pedal channel 6B8-3.
 
Aug 12, 2017     Rudder Pedals - (3 hours) Category: Fuselage
Worked on rudder pedals. Fabricated new pedal for co-pilot side from stock. Fabricated gusset 6B10-4 and upright gussets from stock.
 
Jul 29, 2017     Main Gear - (2 hours) Category: Fuselage
Re-leveled fuselage. Worked on pilot main gear.
 
Jun 04, 2017     Landing Strut - (1.5 hours) Category: Fuselage
Drilled landing strut and uprights. Trimmed cabin floor doubler. Drilled and clecoed top of side skin..
 
May 27, 2017     Instrument Panel - (2 hours) Category: Fuselage
Re-leveled fuselage; installed instrument panel and set width.
 
Apr 23, 2017     Cabin Floor, Panel - (4 hours) Category: Fuselage
Installed upper seat and baggage floor support 16B16-1 along with gussets 16B15-1 right and left. Installed panel gusset 6B12-5. Installed rear channel attachment plate 6ZU3-3 on co-pilot side; cut side skin.
 
Apr 15, 2017     Wing Jig - (3 hours) Category: Fuselage
Fabricated wing jig to finalize location of rear channel attachment plate.
 
Mar 25, 2017     LW Rear Channel Attachment Plate - (2 hours) Category: Fuselage
Drilled and positioned wing rear channel attachment plate 6ZU3-3-cut pilot side skin opening.
 
Mar 18, 2017     Engine Mounts - (4 hours) Category: Fuselage
Installed upper engine mount on pilot side, Completed lower engine mount. Set upper longerons on both sides of cabin.
 
Mar 11, 2017     Fuselage Rear and Cabin Floor - (3 hours) Category: Fuselage
Releveled beams on bench and attached cabin to rear fuselage with clecoes. Set firewall and started engine mount on pilot side.
 
Mar 05, 2017     Fuselage Cabin - (2 hours) Category: Fuselage
Completed installation of double plate for cabin floor. Drilled center spar; primed heel support and pedal bearings.
 
Mar 03, 2017     Fuselage Cabin Bottom - (2.5 hours) Category: Fuselage
Drilled 6B8-3 pedal bearing channel and 6B8-8 heel support. Started upgrade installation of cabin bottom double plate.
 
Jan 09, 2017     LW Rear Channel Upgrade - (3 hours) Category: Wings
Completed rear channel upgrade at root end. De-burred and primed root additional plate and bottom channel upgrade angle. Removed and de-burred rear channel.
 
Jan 08, 2017     LW Flap - (3 hours) Category: Wings
Drilled Flap and rear channel. De-burred bottom skin and prepped for primer.
 
Dec 31, 2016     LW Aileron Upgrade - (3 hours) Category: Wings
Completed aileron upgrade-set and drilled attachment to rear channel. Started flap installation.
 
Dec 27, 2016     LW Aileron Upgrade - (2.5 hours) Category: Wings
Cut hole in rear of aileron to install counter balance arm per upgrade drawing. Rivet line layout for gussets and arm inside aileron. Completed hardware installation for aileron bellcrank cover.
 
Dec 26, 2016     LW Pitot Tube and Aileron Bellcrank - (3 hours) Category: Wings
Installed Pitot tube-drilled skin and removed. Drilled skin for tie-down ring; drilled, primed and removed. Started hardware installation for Aileron Bellcrank cover.
 
Dec 24, 2016     LW Skins and Pitot Tube - (4.5 hours) Category: Wings
Prepped and primed LW leading edge skin. Removed top and bottom skin reinforcing angles and applied primer. Completed installation for reinforcing angles for aileron bellcrank-primed. Started Pitot tube installation.
 
Dec 18, 2016     LW Bottom Main Spar - (2 hours) Category: Wings
Doubled up rivet line on bottom of main spar from root end to rear rib #5. De-burred nose skin.
 
Dec 17, 2016     LW Main Spar Modifications - (3 hours) Category: Wings
Drilled additional holes 20mm on center from root end of main spar to rear rib #5, per B Modification upgrade drawing. Installed lens and backing strip for landing light. Drilled holes in nose ribs 1, 2 and 3 for fuel line.
 
Dec 10, 2016     LW Fuel Tank Nose Skin - (1.5 hours) Category: Wings
Drilled nose skin for fuel tank.
 
Dec 04, 2016     LW Fiberglass Wingtip - (2 hours) Category: Wings
Drilled and clecoed fiberglass wingtip. Started wingtip metal installation.
 
Dec 03, 2016     LW Fuel Tank and Ribs - (2 hours) Category: Wings
Drilled and clecoed short nose rib #4; installed cork protection on fuel tank. Research procedure for installing the fuel level float.
 
Nov 27, 2016     LW Fuel Tank Nose Ribs - (2.5 hours) Category: Wings
Cut bushings to 11 mm and attached Landing Light lenses to channel. De-burred top of nose skin and did layout for standard fuel tank nose ribs.
 
Nov 22, 2016     LW Landing Light - (1.5 hours) Category: Wings
Installed rivet nuts for Landing Light assembly.
 
Nov 20, 2016     LW Nose Ribs, Landing Light - (4.5 hours) Category: Wings
Cut out opening for Landing Light assembly; Installed nose riblet and drilled skin to ribs.
 
Nov 18, 2016     LW Top Skin - (1.5 hours) Category: Wings
Set and drilled top skin main spar. Installed and for wing tip fiberglass and drilled.
 
Nov 05, 2016     LW Nose Skin - (2.5 hours) Category: Wings
Flipped wing over; drilled and clecoed top skin, main spar.
 
Oct 31, 2016     LW Bottom Skin Rivets - (4.5 hours) Category: Wings
Drilled and clecoed bottom skin-Riveted skin.
 
Oct 25, 2016     LW Bottom Skin Angle Bracing - (1 hour) Category: Wings
Installed upgrade drawing reinforcing angles for LW bottom skin.
 
Oct 22, 2016     LW Bottom Skin - (2 hours) Category: Wings
Set bottom skin and completed drilling rear channel. Prepped nose ribs #1 & #2 for fuel line.
 
Oct 21, 2016     LW B Modifications Top Skin - (3 hours) Category: Wings
Completed angle bracing for top skin per upgrade drawing. Drilled and clecoed rear channel. Flipped wing and prepped for bottom skin.
 
Oct 16, 2016     RW B Modifications - (2.5 hours) Category: Wings
Re-set top skin on right wing. Installed angle upgrades to aileron bellcrank-drilled and clecoed.
 
Oct 09, 2016     RW Nose Ribs - (4 hours) Category: Wings
Installed nose ribs on right wing.
 
Jun 26, 2016     Engine Completion and Test Run - (4 hours)       Category: Engine
Completed engine assembly and performed test run at Twin Oaks Airpark in Beaverton, OR.


 
Jun 25, 2016     Engine Assembly Portland Oregon - (12 hours)       Category: Engine
Continued work on engine assembly under supervision of William Wynne Jr. along with 2 other builders.


 
May 08, 2016     Corvair College #38 - (18 hours)       Category: Engine
Corvair College #38 in Cloverdale, CA. 3 day engine building event provided by William Wynne, Jr. Started case work and engine reassembly.


 
Sep 18, 2015     Project Moved Category: Proj. Delay
Project trucked to west coast and put in storage from September to Spring 2016.
 
Jul 18, 2015     Project Put on Hold Category: Proj. Delay
Relocation to west coast for employment. Project stopped.
 
Jun 27, 2015     Left Wing Assembly - (5 hours) Category: Wings
B modification angles added to aileron bracket. Nose ribs installed. Top skin drilled and clecoed.
 
Jun 14, 2015     LW Rear Ribs - (3 hours) Category: Wings
Reinforcing angles added to rear ribs 1-4; wing locker. Wing tip spar angles drilled and clecoed. Rear rib #7 aileron bracket fabricated and drilled.
 