Project: ultracruiser727   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Brandon Edmonds   -  
Project:   Hummel - UltraCruiser   -   VIEW REPORTS
Total Hours:31
Total Flight Time:
Total Expense:$4010.00
Start/Last Date:Apr 18, 2021 - No Finish Date
Engine:ultravair
Propeller:Tennessee Propeller
 
Friendly URL: https://eaabuilderslog.org?s=ultracruiser727

Home or Last Project Picture

May 04, 2023     Spar cap radius work - (1 hour)       Category: Wings
Milled the spar cap notches in the 1" 2024 angle. Just need to final size the tangs.


 
May 03, 2023     spar caps - (3 hours) Category: Wings
cut the 1" 2024 angle for the center spar carry through to length. cut the 3/4" 1/16 thick 2024 angle doubler pieces to length. buffed/polished the .062 2024 sheet angles on the convolute wheel. rounded the corners and polished the laser cut edges. tomorrow i will cut the radiuses on the 1" angle on the mill at work.
 
May 01, 2023     finally some progress! - (3 hours) Category: Wings
used my olfa knife and rough cut the spar webs from the .020 2024 t3 sheet. cut the 12' long sheet to 84" and then cut out 3 full length webs. they will need to be filed and deburred, and cut to length (for the outer panels). spent some time with my 3m wheel and polished all the rough laser cut edges for the wing attach fittings. they are all now nice and shiney.
 
May 07, 2021     Made a few parts - (2 hours) Category: Tail Feathers
Made a few patterns, and made a few rudder hinge pieces. Mistakenly made two rudder control hinges, so ill trim one of them down to be a normal hinge.
 
May 05, 2021     Landing gear spar plates - (3 hours)       Category: Landing Gear
Drilled/ milled the lightening holes and bolt holes for the 1/8" plates that bolt to the lower spar. The hole that the gear leg goes through is not done yet.


 
May 05, 2021     Form blocks - (4 hours)       Category: Tools
Spent some time rough cutting my form blocks. The material is slightly thicker than 1/2" im hoping that will be enough. Material is particle board. Sonex sells forms made from this material so i dont see why it wouldn't work for my purposes.


 
May 02, 2021     Master patterns - (12 hours)       Category: Fuselage
Spent the day making tempered hardboard master templates from vellum tracings i had previously made of the bulkheads. These will be used to make form blocks for the bulkheads and other parts. Also made were the landing gear 1/8 plates, rough cut from stock.


 
Nov 04, 2020     materials kit arrived - (2 hours)       Category: Research
materials kit arrived. contents opened and preliminary inventory taken. a few items noted were missing, and contacted hummel about them. backordered. spar carry through would be laser cut from terry as the material isnt kept on hand for them to ship it. fine by me, less parts to make. i also upgraded to the laser cut 4130 parts, again, to save time.


 
Oct 19, 2020     purchased materials kit from hummel aviation Category: Research
purchased materials kit from hummel aviation, for scratch building.
 
Aug 23, 2017     ordered plans from hummel - (1 hour) Category: Research
ordered plans from terry @ hummel, and spent several days looking them over at work.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.